SOP Templates > Home Builder > Installation > Cleaning (Rough) – Pre-Work Inspection Checklist
Cleaning (Rough) – Pre-Work Inspection Checklist for Home Builder
This checklist ensures that the home is ready for rough cleaning by confirming that all preparatory work has been completed and critical protections are in place. It focuses on verifying the cleanliness of the site, safeguarding installed materials and fixtures, and ensuring all essential installations are complete. By addressing these tasks, the team ensures a smooth and efficient rough cleaning process.
Review the house with the Site Superintendent for any special instructions
Receive the purchase order
Confirm the house is clean and free of trash or debris
Ensure tubs, sinks, countertops, stair treads, hardwood, vinyl, and other surfaces are covered and protected
Verify that faceplates are installed on all switches and receptacles
Check that cabinets are complete, including hardware and shelves
Confirm all appliances are installed
Ensure drywall and painting are complete
Verify all trim is installed
Confirm vinyl flooring is installed and protected
Check that hardwood or parquet flooring is installed and protected
Verify all doors are installed
Ensure all hardware is installed
1
Matt Richards
Completed June 16
View how-to · 6 Steps
2
Sandra Nichols
Completed June 17
View how-to · 5 Steps
3
Assign Member
June 18
View how-to · 6 Steps
4
Assign Member
June 19
View how-to · 5 Steps