Clearing and Grading (Grading 2) – Final Inspection Checklist for Home Builder

7 tasksInstallationHome Builder

This checklist ensures that all grading and backfilling tasks are completed to specification before the Trade Contractor leaves the site. It includes verifying the integrity of mechanicals, proper drainage, and the grading of the lot. By completing this inspection, the lot is left clean, level, and prepared for further development.

1Backfill the slab and confirm all rough mechanicals are intact and undamaged——Add yours

Most tasks do not need a long instruction. Add your company’s how-to in Subtrak only when the step needs one.

2Ensure all foundation drains are clear of dirt and extend 6 inches above the top of the footings——Add yours

Most tasks do not need a long instruction. Add your company’s how-to in Subtrak only when the step needs one.

3Grade the front and backyard——Add yours

Most tasks do not need a long instruction. Add your company’s how-to in Subtrak only when the step needs one.

4Establish swales and berms——Add yours

Most tasks do not need a long instruction. Add your company’s how-to in Subtrak only when the step needs one.

5Verify that water flow direction is correct——Add yours

Most tasks do not need a long instruction. Add your company’s how-to in Subtrak only when the step needs one.

6Remove all excess dirt from the lot——Add yours

Most tasks do not need a long instruction. Add your company’s how-to in Subtrak only when the step needs one.

7Clear the lot of building debris——Add yours

Most tasks do not need a long instruction. Add your company’s how-to in Subtrak only when the step needs one.

You found the SOP

Now make sure it actually gets done.

7 tasks is the easy part. The hard part is that six months from now the project still has to run this way when you are not the one watching.

Book a demo
Jon Engquist
Jon Engquist

Founder of Subtrak · Twenty years in commercial roofing operations

“One session and this template becomes how your company actually does the work, with a name and a date on every step.”
Assigned to the right person
Scheduled from real milestones
Your how-to where it matters
A record that it happened

Every project runs your way. And you can see that it did.

Put a name and a date on every step, and the crew gets a reminder when their part comes up.

Book a demo