Cleaning (Rough) – Final Inspection Checklist for Home Builder
This checklist ensures that the rough cleaning phase is completed to a high standard, leaving the home prepared for carpet installation and final punch-out. It emphasizes sweeping, dusting, and cleaning key areas while ensuring that protective measures remain intact for sensitive surfaces. By completing these tasks, the home is ready for the next stage of construction with minimal risk of damage.
Sweep and clean all floors
Clean windows inside and out
Clean window frames inside and out
Clean cabinets inside and out, including drawers, tops, and fronts
Dust all trim
Ensure the house is ready for carpet installation and final punch-out
Verify that protection for tubs, floors, and other surfaces is still in place
1
Matt Richards
Completed June 5
View how-to · 7 Steps
2
Sandra Nichols
Completed June 6
View how-to · 6 Steps
3
Assign Member
June 7
View how-to · 7 Steps
4
Assign Member
June 8
View how-to · 6 Steps
Run this checklist, don't just read it.
Click Book a Demo to run this checklist on your next project.
- Assign your crew
- Automate reminders
- Verify it got done right