Plumbing (Final) – Final Inspection Checklist for Home Builder
This checklist ensures that all final plumbing installations are completed, operational, and meet project specifications before the trade contractor leaves the jobsite. It emphasizes testing for functionality, verifying alignment, and ensuring that all warranties, tags, and manuals are in place. Additionally, it focuses on cleanliness and the proper condition of the site.
1Set all fixtures——Add yours
Most tasks do not need a long instruction. Add your company’s how-to in Subtrak only when the step needs one.
2Verify all fixtures and faucets (brand and type) match the purchase order and plans——Add yours
Most tasks do not need a long instruction. Add your company’s how-to in Subtrak only when the step needs one.
3Test all fixtures for operation——Add yours
Most tasks do not need a long instruction. Add your company’s how-to in Subtrak only when the step needs one.
4Ensure there are no leaks——Add yours
Most tasks do not need a long instruction. Add your company’s how-to in Subtrak only when the step needs one.
5Verify no excessive noise is heard from water pipes——Add yours
Most tasks do not need a long instruction. Add your company’s how-to in Subtrak only when the step needs one.
6Inspect faucets, tubs, and showers to confirm there are no surface defects——Add yours
Most tasks do not need a long instruction. Add your company’s how-to in Subtrak only when the step needs one.
7Ensure tubs and showers are fully secured to the wall——Add yours
Most tasks do not need a long instruction. Add your company’s how-to in Subtrak only when the step needs one.
8If pedestal sinks are installed, ensure water shutoff valves are accessible and usable——Add yours
Most tasks do not need a long instruction. Add your company’s how-to in Subtrak only when the step needs one.
9Align all faucets and showerheads, ensuring they are level and straight——Add yours
Most tasks do not need a long instruction. Add your company’s how-to in Subtrak only when the step needs one.
10Ensure all regular water shutoffs are accessible and in working order——Add yours
Most tasks do not need a long instruction. Add your company’s how-to in Subtrak only when the step needs one.
11Verify the correct number of water shutoffs——Add yours
Most tasks do not need a long instruction. Add your company’s how-to in Subtrak only when the step needs one.
12Test the water shutoff at the street to ensure it works correctly——Add yours
Most tasks do not need a long instruction. Add your company’s how-to in Subtrak only when the step needs one.
13Tag all hot and cold water shutoffs——Add yours
Most tasks do not need a long instruction. Add your company’s how-to in Subtrak only when the step needs one.
14Tag the main water shutoff——Add yours
Most tasks do not need a long instruction. Add your company’s how-to in Subtrak only when the step needs one.
15Verify clothes washer faucets are working and tagged with hot and cold labels——Add yours
Most tasks do not need a long instruction. Add your company’s how-to in Subtrak only when the step needs one.
16Verify the correct number of outside faucets and ensure all are working——Add yours
Most tasks do not need a long instruction. Add your company’s how-to in Subtrak only when the step needs one.
17Place the strainer and stopper in good condition in the kitchen drawer——Add yours
Most tasks do not need a long instruction. Add your company’s how-to in Subtrak only when the step needs one.
18Place the emergency key for the garbage disposal in the kitchen drawer with the strainer and stopper——Add yours
Most tasks do not need a long instruction. Add your company’s how-to in Subtrak only when the step needs one.
19Place warranty and instruction manuals for the hot water tank and garbage disposal in the kitchen drawer to the left of the range——Add yours
Most tasks do not need a long instruction. Add your company’s how-to in Subtrak only when the step needs one.
20Verify the hot water tank is working——Add yours
Most tasks do not need a long instruction. Add your company’s how-to in Subtrak only when the step needs one.
21Ensure the hot water tank is on a metal stand and secured per manufacturer’s instructions——Add yours
Most tasks do not need a long instruction. Add your company’s how-to in Subtrak only when the step needs one.
22Affix a tag with the name and phone number, including an emergency phone number, to the hot water tank and cabinet door——Add yours
Most tasks do not need a long instruction. Add your company’s how-to in Subtrak only when the step needs one.
23Ensure all inspections have been passed——Add yours
Most tasks do not need a long instruction. Add your company’s how-to in Subtrak only when the step needs one.
24Clean the house, ensuring it is broom-swept and free of debris——Add yours
Most tasks do not need a long instruction. Add your company’s how-to in Subtrak only when the step needs one.
25Clear the jobsite of debris, boxes, and other materials——Add yours
Most tasks do not need a long instruction. Add your company’s how-to in Subtrak only when the step needs one.
You found the SOP
Now make sure it actually gets done.
25 tasks is the easy part. The hard part is that six months from now the project still has to run this way when you are not the one watching.
Book a free strategy session
Founder of Subtrak · Twenty years in commercial roofing operations
“One session and this template becomes how your company actually does the work, with a name and a date on every step.”
Every project runs your way. And you can see that it did.
Put a name and a date on every step, and the crew gets a reminder when their part comes up.
Book a free strategy session