Waterproofing – Final Inspection Checklist for Home Builder
This checklist ensures that waterproofing is applied consistently and thoroughly, meeting quality and coverage standards. It emphasizes correct drain pipe placement, proper thickness of waterproofing, and the cleanliness of the work area.
1Ensure waterproofing fully covers all foundation areas from footing to the top of grade——Add yours
Most tasks do not need a long instruction. Add your company’s how-to in Subtrak only when the step needs one.
2Verify waterproofing is of consistent thickness with no thin or missed spots——Add yours
Most tasks do not need a long instruction. Add your company’s how-to in Subtrak only when the step needs one.
3Ensure stone is 2 inches below the drain pipe and 4 inches above the drain pipe——Add yours
Most tasks do not need a long instruction. Add your company’s how-to in Subtrak only when the step needs one.
4Confirm the drain pipe extends at least 2 feet beyond the outside edge of the footing and 6 inches above the top of the footing——Add yours
Most tasks do not need a long instruction. Add your company’s how-to in Subtrak only when the step needs one.
5Clear the work area of all building debris——Add yours
Most tasks do not need a long instruction. Add your company’s how-to in Subtrak only when the step needs one.
6Verify the lineal footage of the foundation with the Site Superintendent——Add yours
Most tasks do not need a long instruction. Add your company’s how-to in Subtrak only when the step needs one.
7Flag all drain pipes to prevent damage by other trade contractors——Add yours
Most tasks do not need a long instruction. Add your company’s how-to in Subtrak only when the step needs one.
You found the SOP
Now make sure it actually gets done.
7 tasks is the easy part. The hard part is that six months from now the project still has to run this way when you are not the one watching.
Book a free strategy session
Founder of Subtrak · Twenty years in commercial roofing operations
“One session and this template becomes how your company actually does the work, with a name and a date on every step.”
Every project runs your way. And you can see that it did.
Put a name and a date on every step, and the crew gets a reminder when their part comes up.
Book a free strategy session