Pre-Bid Site Visit Process

Confirm crawlspace or trench access date

Bring riser diagrams, plumbing specs

Get trench safety notes and access points

Walk sewer, water, and gas stub-outs

Record trench layout, sewer location

Identify trench collapses or sloped access

Measure pipe fall and spacing

Spot plumbing lines outside spec

Ask about trench fill vs rough timeline

Clarify trench depth and backfill check

Log incorrect stub-out elevations

Send stub-out and trench layout photos

Revise line length, coupling count

Save trench access notes in bid tool