Pre-Construction Workflow
Welcome to the Pre-Construction Workflow SOP Template Library for New Construction (Commercial) Roofing. Access free, expertly crafted Standard Operating Procedures for the pre-construction phase of your commercial roofing projects. Our templates include site assessments, material procurement, and scheduling, ensuring a well-organized start. Download our templates today to streamline your pre-construction activities and set the foundation for a successful project.
Schedule project kickoff meeting
Step 1: Determine Availability of Key Team Members and Client
• Review the schedules of key team members, the client, and the General Contractor (GC) to identify potential meeting dates
• Ensure that the proposed meeting time aligns with everyone’s availability
Step 2: Coordinate Meeting Details and Agenda with Project Manager
• Coordinate with the project manager to confirm the meeting agenda, key topics for discussion, and meeting objectives
• Include key agenda items such as introductions, project overview, roles, responsibilities, and milestones
Step 3: Confirm Meeting Date, Time, and Location with All Participants
• Confirm the finalized meeting date, time, and location with all participants, including internal team members and external stakeholders
• Send calendar invitations or reminders to all attendees
Step 4: Prepare and Share Meeting Agenda in Advance
• Prepare a detailed meeting agenda outlining key discussion points, timelines, and any necessary documents
• Distribute the meeting agenda to all participants at least 48 hours before the meeting
Step 5: Organize Meeting Materials and Presentation Setup
• Organize all materials needed for the meeting, such as project plans, specifications, and presentation slides
• Ensure that the meeting room is reserved, and that all necessary equipment is set up and tested
Step 6: Send Final Meeting Reminder to Attendees
• Send a final reminder to all meeting attendees, confirming the meeting details and agenda
• Include instructions for accessing the meeting, especially if virtual or off-site
Step 7: Set Follow-Up Reminders for Key Actions After the Kickoff Meeting
• Set follow-up reminders in your calendar or CRM for any key actions or deliverables that need to be completed after the kickoff meeting
• Assign responsibilities to the relevant team members
Hold project kickoff meeting
Step 1: Begin the Meeting with Introductions and Objectives
• Start the meeting by introducing all team members and key stakeholders, including the project manager and General Contractor (GC)
• Clearly outline the objectives of the meeting and the desired outcomes
Step 2: Review Project Overview and Key Milestones
• Present an overview of the project, including scope, goals, key deliverables, and expected milestones
• Highlight critical timelines and dependencies to ensure all team members are aligned
Step 3: Define Roles and Responsibilities for the Project Team
• Clearly define the roles and responsibilities of each team member and key stakeholders involved in the project
• Confirm the main point of contact for each area of the project
Step 4: Discuss Project Risks and Mitigation Strategies
• Review potential project risks and the strategies in place to mitigate them
• Invite input from the project team and stakeholders on additional risks or considerations
Step 5: Outline Communication Protocols and Reporting Structure
• Establish communication protocols and the reporting structure for the project
• Confirm the preferred communication methods and frequency of updates with the client and GC
Step 6: Establish Key Project Milestones and Action Items
• Establish key milestones for the project and assign specific action items to the relevant team members
• Set deadlines and ensure everyone is aware of their responsibilities
Step 7: Conclude the Meeting and Confirm Next Steps
• Summarize the key points discussed during the meeting and confirm the next steps for all team members and stakeholders
• Document meeting minutes and distribute them to all participants for reference
Introduce client and General Contractor (GC) to project manager and key team members
Step 1: Schedule an Introduction Meeting with Client and GC
• Coordinate with the client and GC to schedule an introduction meeting with the project manager and key team members
• Confirm a date and time that works for all participants
Step 2: Prepare and Share an Introduction Agenda
• Prepare an agenda for the meeting, including key topics such as team introductions, project overview, and role clarification
• Share the agenda with all participants at least 24 hours before the meeting
Step 3: Begin the Meeting with Team Introductions
• Start the meeting by introducing the client, GC, project manager, and key team members
• Provide a brief background of each person’s role and responsibilities
Step 4: Present an Overview of the Project and Team Structure
• Present an overview of the project, including its objectives, key deliverables, and timelines
• Outline the project team structure and communication hierarchy
Step 5: Clarify the Roles and Responsibilities of Each Key Member
• Clarify the roles and responsibilities of each key team member, focusing on areas of client and GC interaction
• Confirm the primary point of contact for each party involved
Step 6: Establish Communication Channels and Points of Contact
• Establish clear communication channels and confirm the main points of contact for the client and GC
• Ensure that everyone understands the preferred methods of communication and reporting frequency
Step 7: Document and Distribute Meeting Notes
• Document key introductions, roles, and communication protocols discussed during the meeting
• Distribute meeting notes to all participants for reference
Conduct detailed site assessment
Step 1: Schedule and Plan for the Site Assessment
• Schedule the site assessment with key team members, including the project manager, site supervisor, and any necessary specialists
• Confirm the date and time with the client and obtain necessary permissions for site access
Step 2: Prepare a Checklist of Key Areas and Items to Assess
• Prepare a detailed checklist of key areas and items to be assessed during the site visit
• Include elements such as site conditions, access points, utilities, safety hazards, and compliance with project plans
Step 3: Bring Necessary Tools and Documentation to the Site
• Bring all necessary tools, such as measuring equipment, safety gear, and documentation, to conduct the site assessment
• Ensure that team members are briefed on their roles and the assessment checklist
Step 4: Conduct a Walkthrough of the Entire Site
• Begin the assessment with a walkthrough of the entire site, noting the overall conditions and any initial observations
• Take photos and make notes of key areas that require further attention
Step 5: Assess Specific Project Requirements and Site Conditions
• Use the prepared checklist to assess specific project requirements and verify that the site conditions match the project plans
• Identify any discrepancies or challenges that could impact the project
Step 6: Document Observations and Potential Issues
• Document all observations and potential issues identified during the site assessment, including photos, measurements, and notes
• Record any areas that require follow-up actions or modifications to the project plans
Step 7: Share Assessment Findings with Project Team and Client
• Share the findings of the site assessment with the project team and client, highlighting any key concerns or necessary adjustments
• Include a summary of the findings in the project records for reference
Review and confirm project plans and specifications
Step 1: Organize and Prepare All Relevant Project Documents
• Gather and organize all relevant project documents, including plans, drawings, specifications, and client-approved changes
• Ensure that the latest versions of all documents are available for review
Step 2: Schedule a Review Meeting with Key Stakeholders
• Schedule a review meeting with key stakeholders, such as the project manager, design team, and client representatives
• Confirm the meeting date, time, and agenda with all participants
Step 3: Conduct a Section-by-Section Review of Project Plans
• Review the project plans section by section, focusing on critical areas such as design elements, technical specifications, and construction methods
• Confirm that all project requirements are clearly defined and achievable
Step 4: Verify Compliance with Client Requirements and Regulations
• Cross-check the project plans and specifications against client requirements and relevant regulations
• Identify any discrepancies or compliance issues that need to be addressed
Step 5: Confirm Alignment of Plans with Site Conditions
• Ensure that the project plans align with the current site conditions and constraints identified during the site assessment
• Make any necessary adjustments to the plans based on the assessment findings
Step 6: Document Agreed Changes or Updates to the Project Plans
• Document any changes or updates agreed upon during the review meeting and update the project plans accordingly
• Obtain client approval on any modifications made to the original plans
Step 7: Distribute Finalized Project Plans to All Team Members
• Distribute the finalized and client-approved project plans to all relevant team members for implementation
• Save the final version of the plans in the project records for reference
Verify material pricing and lead times
Step 1: Gather Updated Material Quotes from Suppliers
• Reach out to all relevant suppliers to gather updated quotes for materials required for the project
• Confirm the validity of each quote and verify that prices reflect current market rates
Step 2: Review Supplier Lead Times and Availability
• Check with suppliers to confirm lead times for all critical materials and equipment
• Identify any items with extended lead times and communicate these with the project team
Step 3: Compare Supplier Pricing and Lead Times
• Compare the pricing and lead times from different suppliers to identify the best options for each material
• Consider factors such as quality, reliability, and delivery capabilities when making decisions
Step 4: Update the Material Cost Estimate Based on Verified Pricing
• Update the material cost estimate to reflect the verified pricing from suppliers
• Ensure that any changes in pricing or lead times are documented and approved by the project manager
Step 5: Identify Potential Material Shortages or Delays
• Identify any potential material shortages or delays based on supplier feedback
• Develop contingency plans to address these issues and prevent project disruptions
Step 6: Communicate Verified Pricing and Lead Times to Project Team
• Share the verified material pricing and lead times with the project team and key stakeholders
• Update the project timeline if necessary to accommodate material availability
Step 7: Document and Save All Verified Quotes and Lead Times
• Document all verified quotes and lead times in the project records for reference
• Save copies of supplier communications and pricing confirmations for future audits
Develop detailed project schedule
Step 1: Break Down the Project into Key Phases and Tasks
• Break down the entire project into key phases and tasks, such as planning, execution, and closeout
• Define the major milestones and deliverables within each phase
Step 2: Estimate the Duration for Each Task and Activity
• Estimate the duration for each task based on past project experience and industry standards
• Take into account any dependencies, constraints, and resource availability when making estimates
Step 3: Sequence the Tasks and Establish Dependencies
• Identify dependencies between tasks to establish the correct sequence of activities
• Create a clear outline of tasks that must be completed before subsequent tasks can begin
Step 4: Create a Detailed Project Schedule Using Scheduling Software
• Use project scheduling software to create a detailed project schedule with specific start and end dates for each task
• Incorporate all key phases, milestones, task durations, and dependencies into the schedule
Step 5: Review the Draft Schedule with Key Stakeholders
• Share the draft project schedule with key stakeholders, including the project manager, GC, and client representatives
• Gather feedback on the proposed schedule and address any concerns or adjustments needed
Step 6: Adjust the Schedule Based on Feedback and Resource Availability
• Make any necessary adjustments to the project schedule based on stakeholder feedback and resource constraints
• Confirm that all changes are approved and agreed upon by the project team
Step 7: Finalize and Distribute the Project Schedule
• Finalize the project schedule and distribute it to all relevant team members and stakeholders
• Save the schedule in the project records and set up regular updates to track progress
Request master schedule from GC
Step 1: Identify the Key Information Required for the Master Schedule
• Identify the key information you need from the General Contractor’s (GC) master schedule, such as overall project timelines, critical path activities, and key milestones
• Confirm that your request aligns with the scope and coordination needs of your team
Step 2: Submit a Formal Request for the Master Schedule
• Submit a formal request to the GC for the master schedule, specifying the information you need and the preferred format
• Include a deadline for receiving the schedule to align with your planning timelines
Step 3: Follow Up with GC to Confirm Schedule Delivery
• Follow up with the GC to confirm receipt of your request and the expected delivery date for the master schedule
• Clarify any questions the GC may have about the requested information
Step 4: Review the Received Master Schedule for Completeness
• Review the received master schedule to confirm that it includes all required information, such as key project phases, milestones, and dependencies
• Verify that the schedule is formatted in a clear and understandable way
Step 5: Identify and Address Any Scheduling Conflicts or Discrepancies
• Cross-check the master schedule with your project schedule to identify any conflicts, discrepancies, or areas needing further clarification
• Communicate any issues to the GC and work together to resolve them
Step 6: Incorporate the Master Schedule into Your Project Plan
• Incorporate key elements of the master schedule into your project plan to ensure alignment between your team’s activities and the overall project timeline
• Update internal schedules and timelines as needed
Step 7: Share the Master Schedule with Relevant Team Members
• Distribute the final version of the master schedule to all relevant team members and stakeholders
• Save a copy in the project records for ongoing reference and updates
Confirm client's final selections (materials, colors, etc.)
Step 1: Schedule a Final Selection Review Meeting with Client
• Schedule a meeting with the client to review and confirm all final selections, including materials, colors, and finishes
• Ensure that all key decision-makers are available to attend the meeting
Step 2: Prepare and Present a Selection Checklist to the Client
• Prepare a comprehensive checklist of all items requiring the client’s final selection, including materials, colors, fixtures, and finishes
• Present the checklist to the client during the meeting for their review and confirmation
Step 3: Clarify Any Outstanding Questions or Concerns from the Client
• Address any outstanding questions or concerns the client may have regarding their selections
• Provide samples or additional information if needed to help the client make informed decisions
Step 4: Document and Confirm All Final Selections with the Client
• Document all final selections made by the client, including specific brands, colors, sizes, and quantities
• Obtain the client’s written or digital confirmation of the finalized selections
Step 5: Verify Client Selections Against Project Specifications
• Cross-check the client’s final selections with the project specifications to ensure alignment
• Identify and address any discrepancies or changes that need to be made
Step 6: Update Project Plans and Documentation with Final Selections
• Update the project plans and documentation to reflect the client’s final selections
• Communicate the updates to all relevant team members and stakeholders
Step 7: Share the Final Selection Documentation with Project Team
• Share the finalized selection documentation with the project team, including key details and any specific instructions
• Save the final selection records in the project files for reference
Order materials and equipment
Step 1: Prepare a List of Materials and Equipment to Order
• Prepare a detailed list of all materials and equipment needed for the project based on the finalized project plans and client selections
• Include key information such as quantities, specifications, and supplier details
Step 2: Review and Confirm Supplier Quotes and Lead Times
• Review the verified supplier quotes and lead times to confirm that all orders can be fulfilled within the project timeline
• Identify any critical items that require special attention or expedited delivery
Step 3: Submit Purchase Orders to Suppliers
• Submit purchase orders to suppliers based on the finalized list, ensuring that all orders are complete and accurate
• Include all necessary details such as delivery addresses, timelines, and special instructions
Step 4: Confirm Order Details and Delivery Schedules with Suppliers
• Follow up with each supplier to confirm receipt of the purchase orders and delivery schedules
• Clarify any additional requirements or adjustments needed for specific orders
Step 5: Track Order Status and Update Project Timeline as Needed
• Monitor the status of all orders to ensure that deliveries are on track and align with the project schedule
• Update the project timeline if any delays or changes occur
Step 6: Document All Orders and Supplier Communications
• Document all submitted orders, supplier confirmations, and delivery schedules in the project records
• Save copies of purchase orders and supplier receipts for future reference and audits
Step 7: Communicate Order Status and Delivery Dates to Project Team
• Inform the project team of the order status and delivery dates for all materials and equipment
• Assign responsibilities for receiving and inspecting deliveries upon arrival
Verify subcontractor availability and schedules (if applicable)
Step 1: Identify Key Subcontractors Required for the Project
• Identify the key subcontractors needed for the project based on the scope of work and project schedule
• Confirm the specific tasks or roles each subcontractor will be responsible for
Step 2: Reach Out to Subcontractors to Confirm Availability
• Contact each subcontractor to confirm their availability for the project timeline
• Verify that the subcontractor can commit to the required start and end dates for their portion of the work
Step 3: Review and Align Subcontractor Schedules with Project Timeline
• Cross-check the subcontractor’s availability with the project schedule to ensure alignment with key milestones and deadlines
• Identify any potential scheduling conflicts or overlaps that may impact the project timeline
Step 4: Obtain Confirmation of Subcontractor Commitments
• Obtain a written or digital confirmation from each subcontractor indicating their commitment to the project schedule
• Confirm that the subcontractors are aware of the expected work start date and duration
Step 5: Establish Communication Protocols for Schedule Updates
• Set up communication protocols with each subcontractor to receive regular updates on their progress and any changes to their schedule
• Assign a point of contact for coordinating schedule updates with subcontractors
Step 6: Document and Track Subcontractor Schedules in Project Records
• Document the confirmed schedules of all subcontractors in the project records or scheduling software
• Regularly track subcontractor availability and notify the project team of any changes or risks
Step 7: Communicate Subcontractor Schedules to the Project Team
• Share the confirmed subcontractor schedules with the project team to ensure alignment on timing and responsibilities
• Address any concerns or potential conflicts that may arise
Finalize subcontract terms and prepare subcontract documents (if applicable)
Step 1: Confirm All Agreed-Upon Subcontract Terms with Internal Team
• Review the agreed-upon subcontract terms with the internal team, including scope of work, payment schedule, and deadlines
• Address any remaining concerns or discrepancies before drafting the subcontract
Step 2: Draft the Final Subcontract Documents
• Prepare the final subcontract documents, ensuring that all sections are complete and reflect the agreed-upon terms
• Include any necessary attachments, such as project scope, technical specifications, and payment schedules
Step 3: Review the Subcontract Draft for Accuracy and Completeness
• Conduct a thorough review of the subcontract draft to ensure accuracy and completeness
• Cross-check all figures, terms, and legal language with internal stakeholders, such as the legal or finance team
Step 4: Prepare a Subcontract Summary for Easy Reference
• Create a subcontract summary document highlighting key terms, responsibilities, and payment details
• Attach this summary to the full subcontract for easy reference by the subcontractor and project team
Step 5: Obtain Internal Approvals on the Final Subcontract
• Obtain final internal approvals on the subcontract documents from key stakeholders, such as the project manager and legal team
• Address any last-minute adjustments or clarifications before presenting the subcontract to the client and GC
Step 6: Organize and Format the Subcontract Documents for Signing
• Format and organize the subcontract documents in a professional and easy-to-read manner
• Include a cover page and section headings for clarity
Step 7: Save and Secure the Finalized Subcontract Documents
• Save the finalized subcontract documents in the project folder and ensure they are backed up securely
• Restrict access to the documents to authorized personnel only
Obtain client and GC signatures on subcontract (if applicable)
Step 1: Arrange a Meeting to Review and Sign the Subcontract
• Arrange a meeting with the client, GC, and subcontractor to review and sign the subcontract documents
• Confirm the date, time, and location of the meeting with all parties involved
Step 2: Provide Copies of the Subcontract for Review
• Provide copies of the subcontract documents to the client, GC, and subcontractor in advance of the meeting
• Encourage them to review the documents thoroughly and prepare any questions
Step 3: Review Key Terms and Responsibilities During the Meeting
• During the meeting, review the key terms, responsibilities, and expectations outlined in the subcontract
• Address any questions or concerns raised by the client, GC, or subcontractor
Step 4: Obtain Signatures from All Relevant Parties
• Obtain signatures from all relevant parties, including the client, GC, and subcontractor
• Ensure that all required pages are signed and dated correctly
Step 5: Verify Identification and Authorization for Signing
• Verify that the individuals signing the subcontract have the necessary authorization to do so
• Obtain additional identification or documentation if required for legal purposes
Step 6: Witness and Acknowledge the Subcontract Signing
• Act as a witness to the subcontract signing if required, and acknowledge the signing date and time
• Ensure that all parties have completed the signing process properly
Step 7: Thank All Parties for Finalizing the Subcontract
• Thank the client, GC, and subcontractor for their time and cooperation in finalizing the subcontract
• Confirm the next steps in the project and any follow-up actions needed
Provide subcontractor with a copy of the signed subcontract (if applicable)
Step 1: Create Copies of the Signed Subcontract for the Subcontractor
• Create multiple copies of the signed subcontract for the subcontractor, ensuring all pages are clear and legible
• Include any attachments or additional documents that are part of the subcontract
Step 2: Prepare a Cover Letter for the Signed Subcontract
• Prepare a professional cover letter to accompany the signed subcontract copies, thanking the subcontractor and summarizing key terms
• Include contact information for any follow-up questions or clarifications
Step 3: Deliver the Signed Subcontract Copies to the Subcontractor
• Deliver the signed subcontract copies to the subcontractor using their preferred method, such as email, postal service, or in-person delivery
• Confirm receipt of the subcontract copies with the subcontractor
Step 4: Confirm That the Subcontractor Has Received the Signed Subcontract
• Follow up with the subcontractor to confirm that they have received the signed subcontract copies in full
• Address any additional requests for copies or related documents if needed
Step 5: Store the Signed Subcontract Copies Securely
• Store the original and digital copies of the signed subcontract securely in your company’s records
• Ensure that access to the signed subcontracts is restricted to authorized personnel
Step 6: Notify Project Team of the Signed Subcontract and Next Steps
• Inform the project team that the subcontract has been signed and the subcontractor is ready to begin work
• Provide a summary of the key subcontract terms and conditions to the team
Step 7: Set Reminders for Subcontract-Related Follow-Up Actions
• Set reminders in your calendar or CRM for any follow-up actions related to the signed subcontract, such as payments or project coordination
• Communicate these reminders to the relevant team members
Review permitting requirements
Step 1: Identify All Relevant Permits Required for the Project
• Review the project scope and specifications to identify all necessary permits required for construction activities, such as building permits, zoning permits, and environmental permits
• Confirm permit requirements based on the local regulations and project location
Step 2: Research and Gather Information on Permit Applications
• Research the specific requirements for each permit application, including forms, fees, and supporting documentation
• Obtain the most up-to-date permit application forms from the relevant authorities or agencies
Step 3: Confirm Permit Application Deadlines and Processing Times
• Confirm the submission deadlines and estimated processing times for each permit application
• Account for these timelines in the overall project schedule to avoid delays
Step 4: Coordinate with the Project Team to Prepare Permit Applications
• Coordinate with the project manager, GC, and relevant team members to prepare the necessary permit applications and supporting documents
• Ensure that all forms are complete, accurate, and aligned with the project plans
Step 5: Submit Permit Applications to the Appropriate Authorities
• Submit the completed permit applications to the appropriate authorities or agencies, following their specific submission guidelines
• Obtain confirmation of receipt for each submitted application
Step 6: Track the Status of Permit Applications and Follow Up as Needed
• Monitor the status of all submitted permit applications and follow up with the authorities as needed to ensure timely processing
• Address any issues or additional requirements raised by the permitting authorities
Step 7: Document and Communicate Permit Approvals to the Project Team
• Document all approved permits and save copies in the project records
• Communicate permit approvals to the project team and update the project schedule to reflect the authorized activities
Procure necessary permits
Step 1: Identify All Permits Required for the Project
• Review the project scope and legal requirements to identify all necessary permits for construction activities
• Confirm specific permit requirements based on local regulations, zoning laws, and project specifications
Step 2: Prepare All Permit Applications and Supporting Documents
• Gather all required forms, supporting documents, and details for each permit application, such as project plans, environmental reports, and fee payments
• Ensure that all forms are accurately completed and signed by authorized personnel
Step 3: Submit Permit Applications to Relevant Authorities
• Submit the completed permit applications to the relevant local authorities or permitting agencies
• Follow each authority’s specific guidelines for submission, including digital or physical documentation
Step 4: Track the Processing Status of Permit Applications
• Monitor the status of submitted permit applications through the relevant authorities or agencies
• Set reminders for follow-up actions to ensure that permits are approved within the expected timeframe
Step 5: Address Any Requests for Additional Information or Revisions
• Respond promptly to any requests for additional information or revisions from permitting authorities
• Work closely with the project team and legal advisors to address any compliance issues or concerns
Step 6: Obtain Approval and Collect the Necessary Permits
• Once approved, collect the necessary permits and verify that all conditions and requirements are met
• Confirm that the permits cover all relevant aspects of the project
Step 7: Document and Communicate Permit Approvals to Project Team
• Document the approved permits in the project records and communicate the approvals to the project team
• Update the project schedule and notify key stakeholders of authorized activities
Create site safety plan
Step 1: Conduct a Risk Assessment of the Project Site
• Conduct a thorough risk assessment of the project site to identify potential hazards and risks
• Include key areas such as equipment use, electrical safety, material handling, and working at heights
Step 2: Define Safety Protocols and Responsibilities
• Define specific safety protocols for all identified risks and assign responsibilities to project team members for enforcing safety measures
• Include roles such as safety supervisors, first-aid officers, and equipment inspectors
Step 3: Establish Emergency Procedures and Contact Information
• Establish clear emergency procedures for incidents such as fires, accidents, and medical emergencies
• Provide contact information for emergency services and internal safety personnel
Step 4: Create a Safety Training Plan for All Workers
• Develop a training plan to ensure all workers and subcontractors receive proper safety training before entering the site
• Schedule regular safety meetings and refresher training sessions
Step 5: Prepare Safety Documentation and Reporting Forms
• Prepare safety documentation, including daily safety checklists, incident report forms, and inspection records
• Ensure that all forms are accessible and clearly understood by the project team
Step 6: Distribute the Site Safety Plan to All Team Members
• Distribute copies of the site safety plan to all team members and subcontractors involved in the project
• Hold a meeting to review the plan, answer questions, and clarify any protocols
Step 7: Set Up Regular Safety Inspections and Audits
• Schedule regular safety inspections and audits to monitor compliance with the safety plan
• Assign a safety officer to oversee inspections and report findings to the project manager
Create fall protection plan
Step 1: Identify Fall Hazards at the Project Site
• Conduct a site assessment to identify all potential fall hazards, including unprotected edges, open holes, scaffolding, and elevated platforms
• Document these hazards in the fall protection plan for reference
Step 2: Determine Appropriate Fall Protection Systems and Equipment
• Determine the appropriate fall protection systems and equipment needed for each identified hazard, such as guardrails, harnesses, safety nets, and personal fall arrest systems
• Verify that all equipment meets industry standards and regulations
Step 3: Develop Specific Fall Protection Procedures for Each Task
• Create specific fall protection procedures for tasks involving elevated work, ensuring that all workers are aware of the protocols
• Include guidelines for setting up, using, and inspecting fall protection equipment
Step 4: Establish Roles and Responsibilities for Fall Protection
• Assign roles and responsibilities for fall protection oversight, including a designated safety supervisor and trained fall protection personnel
• Confirm that these individuals are trained in proper equipment use and emergency response
Step 5: Provide Fall Protection Training for All Workers
• Schedule mandatory fall protection training sessions for all workers and subcontractors who will be working at heights
• Ensure that workers are trained in equipment usage, hazard identification, and rescue procedures
Step 6: Prepare Documentation and Reporting Forms
• Prepare fall protection documentation, including equipment inspection checklists, fall incident reports, and training attendance sheets
• Ensure that all documentation is up to date and readily accessible on-site
Step 7: Distribute and Communicate the Fall Protection Plan to All Team Members
• Distribute copies of the fall protection plan to all relevant team members and hold a meeting to review the plan
• Conduct a site walkthrough to demonstrate fall protection measures and answer questions
Establish project communication plan
Step 1: Define Key Communication Objectives and Protocols
• Define the key communication objectives for the project, including the exchange of information, reporting requirements, and decision-making processes
• Establish clear protocols for internal and external communication
Step 2: Identify Main Points of Contact and Their Roles
• Identify the main points of contact for each area of the project, such as the project manager, GC, client representatives, and key subcontractors
• Create a contact list with roles and responsibilities for easy reference
Step 3: Select Appropriate Communication Channels and Tools
• Determine the most effective communication channels for the project, such as email, phone calls, meetings, and project management software
• Establish guidelines for the frequency and format of communications
Step 4: Establish a Meeting Schedule and Reporting Structure
• Create a meeting schedule for key project meetings, including weekly progress meetings, safety meetings, and client updates
• Define the reporting structure for submitting daily reports, progress updates, and incident reports
Step 5: Create a Crisis Communication Plan for Emergencies
• Develop a crisis communication plan to manage emergencies, such as safety incidents or schedule disruptions
• Include protocols for notifying key stakeholders, documenting incidents, and coordinating responses
Step 6: Distribute the Project Communication Plan to All Stakeholders
• Distribute the finalized project communication plan to all stakeholders, including internal team members, the GC, subcontractors, and the client
• Ensure that everyone understands their roles and responsibilities within the communication plan
Step 7: Set Up Regular Reviews and Updates of the Communication Plan
• Schedule regular reviews and updates of the communication plan to adapt to project changes or new stakeholders
• Assign a team member to monitor and enforce adherence to the plan
Coordinate site logistics with GC and other subcontractors
Step 1: Schedule a Logistics Coordination Meeting with GC and Subcontractors
• Schedule a meeting with the GC and key subcontractors to coordinate site logistics, such as material deliveries, equipment usage, and site access
• Confirm the meeting date, time, and location with all participants
Step 2: Create a Site Logistics Plan and Agenda for the Meeting
• Prepare a site logistics plan that includes key elements such as staging areas, equipment storage, delivery schedules, and waste management
• Draft an agenda for the meeting to ensure all key points are discussed
Step 3: Review and Confirm Material Delivery and Storage Areas
• Review and confirm designated areas for material delivery, storage, and staging with the GC and subcontractors
• Identify any access restrictions or special handling requirements for specific materials
Step 4: Discuss Equipment Usage and Scheduling to Avoid Conflicts
• Discuss equipment usage and scheduling to avoid conflicts between subcontractors, such as crane operations, heavy machinery, and scaffolding
• Confirm that all equipment will be available and accessible as needed
Step 5: Establish Protocols for Site Access and Traffic Management
• Establish protocols for site access, including entry and exit points, visitor controls, and traffic management
• Coordinate with the GC to assign responsibilities for monitoring and enforcing these protocols
Step 6: Confirm Waste Management and Clean-Up Procedures
• Confirm waste management and clean-up procedures with the GC and subcontractors, including waste disposal schedules and recycling requirements
• Ensure that everyone understands their responsibilities for maintaining a clean and safe site
Step 7: Document and Distribute the Site Logistics Plan to All Parties
• Document the finalized site logistics plan and distribute it to all relevant parties, including the GC, subcontractors, and the project team
• Save a copy in the project records and review it regularly to address any changes
Prepare equipment for mobilization
Step 1: Review Equipment Requirements and Inventory
• Review the project plans to identify all necessary equipment required for the upcoming construction activities
• Conduct an inventory check to confirm that all required equipment is available and in good working condition
Step 2: Inspect and Perform Maintenance on Equipment
• Inspect each piece of equipment for any signs of wear or damage that could affect its performance on-site
• Perform any necessary maintenance or repairs to ensure that all equipment is fully functional and safe to use
Step 3: Organize and Label Equipment for Transport
• Organize all equipment for easy transport, grouping items based on their intended use or location on the site
• Label each piece of equipment with its designated area or purpose to facilitate smooth deployment on-site
Step 4: Coordinate Transportation and Delivery Logistics
• Coordinate with the logistics team or transportation providers to arrange the delivery of equipment to the site
• Confirm the delivery schedule and any special handling requirements with the transport team
Step 5: Secure Equipment for Safe Transport
• Secure all equipment properly to prevent damage or movement during transport
• Verify that all safety protocols are followed when loading and securing equipment
Step 6: Communicate Equipment Mobilization Plan to Project Team
• Share the equipment mobilization plan with the project team and key stakeholders, highlighting delivery dates and responsibilities
• Assign a point of contact to oversee the mobilization and handle any issues that arise
Step 7: Track Equipment Delivery and Arrival on Site
• Track the delivery of equipment to ensure it arrives on-site according to schedule
• Verify the condition of all equipment upon arrival and address any issues immediately
Prepare site for construction
Step 1: Clear and Secure the Project Site
• Clear the project site of any debris, obstructions, or hazards that could impede construction activities
• Secure the site perimeter with fencing, signage, or barricades to prevent unauthorized access
Step 2: Set Up Temporary Facilities and Utilities
• Set up temporary facilities, such as office trailers, restrooms, and storage units, as needed for the project duration
• Arrange for necessary utilities, such as water, electricity, and internet, to be connected to the site
Step 3: Establish Access Points and Traffic Flow
• Designate and mark access points for vehicles, equipment, and personnel entering and exiting the site
• Establish a clear traffic flow plan to avoid congestion and ensure the safe movement of materials and workers
Step 4: Prepare Material Staging and Storage Areas
• Identify and set up designated areas for material staging and storage, ensuring they are easily accessible and protected from weather
• Label and organize materials to facilitate efficient handling and inventory tracking
Step 5: Verify Site Safety Measures and Compliance
• Conduct a safety check to verify that all necessary safety measures, such as barriers, warning signs, and first-aid stations, are in place
• Confirm compliance with local regulations and site safety standards
Step 6: Communicate Site Setup Details to Project Team
• Share the site setup details with the project team, including access points, traffic flow, and material storage locations
• Provide a map or diagram of the site layout to all team members
Step 7: Conduct a Final Site Inspection Before Construction Starts
• Conduct a final inspection of the site to ensure that all preparations are complete and ready for construction activities
• Address any remaining issues or adjustments needed before work begins
Conduct final pre-construction review meeting with GC and key stakeholders
Step 1: Schedule the Pre-Construction Review Meeting
• Schedule the final pre-construction review meeting with the General Contractor (GC) and key stakeholders, including project managers, subcontractors, and client representatives
• Confirm the date, time, and location of the meeting with all participants
Step 2: Prepare an Agenda and Relevant Documents for the Meeting
• Prepare an agenda for the meeting that includes key topics such as project plans, timelines, safety protocols, and stakeholder responsibilities
• Gather all relevant documents, such as project schedules, permits, and safety plans, to present at the meeting
Step 3: Begin the Meeting with Introductions and Objectives
• Start the meeting by introducing all participants and outlining the objectives of the pre-construction review
• Confirm that everyone understands the purpose of the meeting and the key outcomes to be achieved
Step 4: Review Project Plans, Timelines, and Key Milestones
• Review the project plans in detail, highlighting critical milestones, dependencies, and deadlines
• Confirm that the project schedule aligns with the expectations of all stakeholders
Step 5: Discuss Safety Protocols and Compliance Requirements
• Review the site safety plan and any compliance requirements that need to be followed during construction
• Ensure that all stakeholders understand their roles and responsibilities related to safety and compliance
Step 6: Address Any Open Questions or Concerns from Stakeholders
• Invite stakeholders to ask questions or raise concerns about any aspect of the project, such as logistics, resource availability, or scheduling conflicts
• Provide clear answers and document any agreed-upon changes
Step 7: Summarize Key Takeaways and Confirm Next Steps
• Summarize the key takeaways from the meeting, including confirmed plans, updated timelines, and action items for each stakeholder
• Distribute meeting minutes to all participants and update project records accordingly
Construction SOPs Your Employees Will Actually Use!
Subtrak’s game-changing SOP software helps contractors effortlessly document their processes and automatically delegate tasks to their entire project team, making sure everyone knows exactly what to do and when.