Pre-Construction Workflow

Welcome to the Pre-Construction Workflow SOP Template Library for New Construction Residential Roofing. Access free, expertly crafted Standard Operating Procedures for the pre-construction phase of your residential roofing projects. Our templates include site assessments, material procurement, and scheduling, ensuring a well-organized start. Download our templates today to streamline your pre-construction activities and set the foundation for a successful project.

`

Schedule project kickoff meeting

Step 1: Identify Participants
  • List all key participants who need to attend the project kickoff meeting.
  • Include internal team members, the GC, subcontractors, and any other relevant stakeholders.
Step 2: Propose Meeting Times
  • Contact all participants to propose three potential dates and times for the meeting.
  • Ensure the proposed times are within normal business hours and convenient for all parties.
Step 3: Confirm Availability
  • Wait for responses from all participants and confirm a mutually convenient time.
  • If the initial suggestions don’t work, propose alternative dates.
Step 4: Send Confirmation
  • Send a calendar invitation to all participants with the confirmed date, time, and location (or virtual meeting link).
  • Include a brief agenda outlining the purpose of the meeting.
Step 5: Prepare Agenda
  • Draft an agenda covering key points to discuss during the meeting, such as project scope, roles and responsibilities, timelines, and any initial concerns.
  • Share the agenda with all participants ahead of the meeting.
Step 6: Gather Necessary Documents
  • Collect all relevant materials or documents needed for the meeting, including project plans, initial schedules, and any supporting information.
  • Ensure all documents are up-to-date and accurately reflect the project details.
Step 7: Notify Internal Team Members
  • Inform any internal team members who need to attend the meeting.
  • Brief them on their roles and the key points to discuss.
Step 8: Confirm Meeting Details with GC
  • Follow up with the GC a day before the meeting to confirm attendance and address any last-minute changes.
  • Ensure the GC has all the necessary information and is prepared for the meeting.
Step 9: Set Up Meeting Space
  • If the meeting is in-person, ensure the meeting room is booked and properly set up.
  • If the meeting is virtual, test the online meeting platform to ensure it is working correctly.
Step 10: Document the Process
  • Record the scheduled meeting details in your CRM or project management system.
  • Set reminders for the meeting and any follow-up tasks.

Hold project kickoff meeting

Step 1: Prepare Meeting Materials
  • Ensure all necessary materials are prepared and organized, including project plans, schedules, and any supporting documents.
  • Bring copies of these materials for all participants or ensure digital access if the meeting is virtual.
Step 2: Set Up Meeting Space
  • Arrive early to set up the meeting space if the meeting is in-person.
  • Ensure all equipment, such as projectors or video conferencing tools, is functioning properly.
Step 3: Introduce Participants
  • Begin the meeting by introducing yourself and any team members present.
  • Allow each participant to briefly introduce themselves and their role in the project.
Step 4: Outline Meeting Agenda
  • Review the meeting agenda to set expectations and ensure all key points will be covered.
  • Clarify the objectives of the meeting and the desired outcomes.
Step 5: Discuss Project Scope and Objectives
  • Present an overview of the project scope, goals, and objectives.
  • Highlight the key deliverables and success criteria for the project.
Step 6: Review Roles and Responsibilities
  • Clarify the roles and responsibilities of each team member and stakeholder.
  • Ensure everyone understands their tasks and how they contribute to the project’s success.
Step 7: Present Project Timeline
  • Walk through the project timeline, including key milestones and deadlines.
  • Discuss any potential challenges or critical paths that may impact the schedule.
Step 8: Address Questions and Concerns
  • Encourage participants to ask questions and express any concerns they may have.
  • Provide clear and concise answers to ensure everyone is on the same page.
Step 9: Summarize Key Points and Next Steps
  • Summarize the main points discussed during the meeting.
  • Outline the next steps and any immediate actions required from the participants.
Step 10: Document Meeting Minutes
  • Record detailed minutes of the meeting, capturing all key discussions, decisions, and action items.
  • Distribute the meeting minutes to all participants and relevant stakeholders.

Conduct detailed site assessment

Step 1: Prepare for the Site Visit
  • Review all available project plans, site maps, and relevant documentation specific to the roofing project.
  • Ensure you have the necessary tools and equipment for the assessment, such as measuring tapes, cameras, ladders, and safety gear (e.g., harnesses, helmets).
Step 2: Schedule the Site Visit
  • Coordinate with the GC and any necessary team members to schedule the site visit.
  • Confirm the date, time, and location, and ensure all participants are informed.
Step 3: Conduct Initial Walkthrough
  • Upon arrival, conduct an initial walkthrough of the site to get an overall sense of the building and roof area.
  • Identify key areas to focus on during the detailed assessment.
Step 4: Inspect Roof Condition
  • Thoroughly inspect the current condition of the roof.
  • Look for signs of wear and tear, damage, leaks, and any areas that may need repair or replacement.
Step 5: Take Detailed Measurements
  • Measure key areas of the roof, including dimensions, slope, and pitch.
  • Record the measurements of roof sections, penetrations (such as chimneys and skylights), and any other relevant features.
Step 6: Document Roof Materials
  • Identify and document the existing roofing materials (e.g., shingles, tiles, metal, etc.).
  • Note the condition and type of underlayment, flashing, and gutters.
Step 7: Capture Photographs and Videos
  • Take clear photographs and videos of the roof’s condition, including close-ups of any damage or areas of concern.
  • Ensure you capture multiple angles and perspectives to provide a comprehensive visual record.
Step 8: Identify Potential Challenges
  • Note any potential challenges or issues that could impact the roofing project, such as access limitations, structural concerns, or weather conditions.
  • Discuss possible solutions or mitigations for these challenges.
Step 9: Consult with Team Members
  • If applicable, discuss the roof conditions and observations with any team members present.
  • Ensure everyone has a clear understanding of the roof and any potential issues.
Step 10: Summarize Findings
  • Compile all notes, measurements, photographs, and observations into a detailed site assessment report specific to the roofing project.
  • Highlight any key findings, challenges, and recommendations.

Send RFIs to GC to clarify any questions from site assessment

Step 1: Compile Questions and Observations
  • Review the detailed site assessment report and identify any questions or uncertainties.
  • Compile a list of specific questions and observations that need clarification from the General Contractor (GC).
Step 2: Draft Request for Information (RFI)
  • Prepare an RFI document that includes all questions and observations from the site assessment.
  • Ensure each question is clearly stated and includes any necessary context or references to the site assessment.
Step 3: Organize RFIs by Category
  • Organize the questions into categories such as structural concerns, roofing materials, access limitations, and any other relevant topics.
  • This makes it easier for the GC to address each point systematically.
Step 4: Provide Supporting Documentation
  • Attach any supporting documentation, such as photographs, measurements, and notes from the site assessment, to the RFI.
  • Ensure each piece of supporting information is clearly labeled and referenced in the RFI.
Step 5: Draft a Cover Letter
  • Write a brief cover letter to accompany the RFI document.
  • Explain the purpose of the RFI and highlight any urgent or critical questions that require immediate attention.
Step 6: Review and Edit
  • Review the RFI document and cover letter for clarity and completeness.
  • Ensure all questions are clearly stated and free of any ambiguity.
Step 7: Send the RFI to the GC
  • Email the RFI document and cover letter to the GC.
  • Ensure you use the correct contact information and request a confirmation of receipt.
Step 8: Track the RFI Submission
  • Record the submission details in your CRM or project management system.
  • Include the date sent, the recipient’s contact information, and a brief summary of the questions.
Step 9: Set a Follow-Up Reminder
  • Set a reminder to follow up with the GC if no response is received within the specified timeframe.
  • Ensure timely follow-up to keep the project on schedule.
Step 10: Review Responses from the GC
  • Once the GC responds, review their answers carefully.
  • Clarify any further points if needed and ensure all questions have been satisfactorily addressed.

Send PCOs to GC for RFI answers that add scope to project

Step 1: Review RFI Responses
  • Carefully review the responses received from the GC for your RFIs.
  • Identify any responses that result in changes or additions to the project scope.
Step 2: Determine Scope Changes
  • Document the specific changes to the project scope based on the RFI answers.
  • Include details such as additional work required, new materials needed, or changes to the project timeline.
Step 3: Prepare a Proposed Change Order (PCO)
  • Draft a PCO that outlines the changes to the project scope.
  • Include a detailed description of the additional work, the reasons for the changes, and any supporting documentation.
Step 4: Estimate Additional Costs
  • Calculate the additional costs associated with the changes to the project scope.
  • Include labor, materials, equipment, and any other relevant expenses.
Step 5: Update Project Schedule
  • Adjust the project schedule to reflect the changes resulting from the RFI answers.
  • Ensure the revised schedule accounts for any additional time needed to complete the new scope of work.
Step 6: Draft a Cover Letter
  • Write a brief cover letter to accompany the PCO.
  • Explain the reasons for the change order, summarize the additional scope, and highlight any impacts on cost and schedule.
Step 7: Review and Edit
  • Review the PCO and cover letter for accuracy and clarity.
  • Ensure all changes, costs, and schedule adjustments are clearly stated and justified.
Step 8: Send the PCO to the GC
  • Email the PCO and cover letter to the GC.
  • Ensure you use the correct contact information and request a confirmation of receipt.
Step 9: Track the PCO Submission
  • Record the submission details in your CRM or project management system.
  • Include the date sent, the recipient’s contact information, and a brief summary of the changes.
Step 10: Set a Follow-Up Reminder
  • Set a reminder to follow up with the GC if no response is received within the specified timeframe.
  • Ensure timely follow-up to keep the project on schedule.
Step 11: Review GC’s Response
  • Once the GC responds, review their acceptance or feedback on the PCO.
  • Address any further questions or required adjustments promptly.

Verify material pricing and lead times

Step 1: Review Project Requirements
  • Examine the project scope and identify all materials required for the roofing project.
  • Ensure you have a comprehensive list of materials with specifications.
Step 2: Contact Suppliers
  • Reach out to multiple suppliers to request current pricing and lead times for the required materials.
  • Ensure you provide detailed specifications to get accurate quotes.
Step 3: Compare Quotes
  • Collect and compare quotes from different suppliers.
  • Evaluate the pricing, lead times, and any additional terms or conditions.
Step 4: Verify Lead Times
  • Confirm the lead times provided by each supplier.
  • Ensure the lead times align with the project schedule and identify any potential delays.
Step 5: Check Supplier Reliability
  • Assess the reliability of each supplier based on past performance, references, and reviews.
  • Ensure they can consistently meet the required delivery schedules.
Step 6: Negotiate Terms
  • If necessary, negotiate better pricing or lead times with the preferred suppliers.
  • Discuss bulk purchasing, discounts, or expedited shipping options.
Step 7: Document Findings
  • Record the verified pricing and lead times for each material.
  • Include supplier contact information, quotes, and any negotiated terms.
Step 8: Update Project Budget and Schedule
  • Adjust the project budget and schedule based on the verified material costs and lead times.
  • Ensure all changes are documented and communicated to the relevant team members.

Request master schedule from GC

Step 1: Prepare Request Details
  • Identify the specific information needed from the master schedule, such as key milestones, deadlines, and critical path activities relevant to the roofing project.
  • Ensure you have a clear understanding of the project scope and requirements.
Step 2: Draft Request for Master Schedule
  • Write a clear and concise request for the master schedule.
  • Include a brief explanation of why the schedule is needed and specify any particular details you require.
Step 3: Contact the GC
  • Send the request to the GC via email or your preferred communication platform.
  • Ensure you use the correct contact information and address the request to the appropriate person.
Step 4: Follow Up
  • If no response is received within a few days, follow up with a polite reminder.
  • Ensure the follow-up is documented and maintains a professional tone.
Step 5: Receive the Master Schedule
  • Once the GC provides the master schedule, acknowledge receipt promptly.
  • Thank the GC for their cooperation and confirm that you have received the document.
Step 6: Review the Master Schedule
  • Examine the master schedule to ensure it includes all the necessary details.
  • Identify any potential conflicts or critical dates that impact the roofing project.
Step 7: Share with Relevant Team Members
  • Distribute the master schedule to internal team members and any relevant subcontractors.
  • Ensure everyone involved in the project is informed and aware of the key milestones.
Step 8: Document the Schedule
  • Record the master schedule details in your project management system.
  • Ensure the document is easily accessible for future reference.
Step 9: Confirm Understanding
  • Ensure all team members understand the master schedule and their responsibilities.
  • Address any questions or clarifications needed to ensure alignment.
Step 10: Monitor for Updates
  • Set reminders to periodically check for any updates or changes to the master schedule from the GC.
  • Ensure the project team stays informed of any modifications.

Develop detailed project schedule for roofing work

Step 1: Review Master Schedule and Project Scope
  • Examine the master schedule provided by the GC and review the project scope specific to the roofing work.
  • Identify key milestones, deadlines, and any dependencies that impact the roofing tasks.
Step 2: Identify Roofing Tasks and Milestones
  • List all tasks required to complete the roofing work, including preparation, installation, inspections, and any follow-up activities.
  • Define key milestones such as start dates, completion dates, and critical deadlines.
Step 3: Estimate Task Durations
  • Estimate the time required to complete each roofing task.
  • Use historical data and team input to ensure accuracy.
Step 4: Sequence the Tasks
  • Determine the order in which tasks need to be performed.
  • Identify dependencies and ensure tasks are logically sequenced to avoid delays.
Step 5: Allocate Resources
  • Assign team members, subcontractors, and equipment to each task.
  • Ensure resources are available and properly allocated to meet the schedule.
Step 6: Create the Schedule
  • Use project management software or tools to create the detailed project schedule.
  • Input all tasks, durations, dependencies, and resources to visualize the project flow.
Step 7: Review and Adjust
  • Share the draft schedule with the project team for feedback.
  • Adjust the schedule based on input to ensure feasibility and alignment with the master schedule.
Step 8: Finalize the Schedule
  • Confirm the final detailed project schedule with all stakeholders.
  • Ensure the schedule is clear, comprehensive, and agreed upon by the team.
Step 9: Document and Share the Schedule
  • Document the finalized schedule and distribute it to all relevant parties.
  • Ensure everyone involved in the project has access to the schedule and understands their responsibilities.
Step 10: Monitor Progress and Update the Schedule
  • Regularly monitor the progress of the roofing work against the schedule.
  • Update the schedule as needed to reflect any changes or delays and communicate updates to the team.

Confirm GC's final selections (colors, etc.)

Step 1: Prepare Selection Options
  • Gather all available options for the GC’s final selections, including colors, materials, and finishes.
  • Prepare samples or visual aids to present to the GC.
Step 2: Schedule a Selection Meeting
  • Contact the GC to schedule a meeting to review and confirm their final selections.
  • Ensure the meeting time is convenient for both parties and allow sufficient time for decision-making.
Step 3: Present Options to the GC
  • During the meeting, present the available options to the GC.
  • Provide detailed information on each option, including benefits, durability, and any maintenance requirements.
Step 4: Answer GC Questions
  • Address any questions or concerns the GC may have about the selections.
  • Provide clear and concise answers to help the GC make an informed decision.
Step 5: Document GC’s Selections
  • Once the GC has made their final selections, document the choices clearly.
  • Include details such as color codes, material specifications, and any special instructions.
Step 6: Obtain GC’s Written Approval
  • Request the GC to provide written approval of their final selections.
  • Ensure the approval is dated and signed to avoid any future misunderstandings.
Step 7: Update Project Documentation
  • Update all relevant project documents with the GC’s final selections.
  • Ensure the information is accurately reflected in the project plans and schedules.
Step 8: Communicate Selections to Team
  • Inform the project team and any subcontractors of the GC’s final selections.
  • Ensure everyone involved in the project is aware of the details and any specific requirements.
Step 9: Verify Material Availability
  • Confirm the availability of the selected materials with suppliers.
  • Ensure the materials can be delivered within the project timeline.
Step 10: Record in CRM/System
  • Record the GC’s final selections and approvals in your CRM or project management system.
  • Ensure the information is easily accessible for future reference.

Order materials and equipment

Step 1: Review Final Selections and Project Requirements
  • Examine the GC’s final selections and the project requirements.
  • Ensure you have a comprehensive list of all materials and equipment needed for the roofing project.
Step 2: Verify Supplier Information
  • Confirm the contact details and ordering procedures for preferred suppliers.
  • Ensure you have up-to-date information on pricing, lead times, and availability.
Step 3: Prepare Purchase Orders
  • Draft purchase orders (POs) for all required materials and equipment.
  • Include detailed specifications, quantities, and any specific delivery instructions.
Step 4: Obtain Internal Approvals
  • If necessary, seek internal approvals for the purchase orders.
  • Ensure all relevant stakeholders sign off on the orders before proceeding.
Step 5: Place Orders with Suppliers
  • Submit the purchase orders to the selected suppliers via email, phone, or online ordering system.
  • Ensure you receive confirmation of receipt from each supplier.
Step 6: Confirm Delivery Schedules
  • Verify the delivery schedules provided by the suppliers.
  • Ensure the delivery dates align with the project schedule and adjust if necessary.
Step 7: Track Order Status
  • Monitor the status of each order to ensure timely delivery.
  • Follow up with suppliers if there are any delays or issues with the order.
Step 8: Notify Project Team
  • Inform the project team of the ordered materials and equipment.
  • Provide details on expected delivery dates and any special handling instructions.

Finalize subcontract terms and prepare subcontract documents

Step 1: Review Project Scope and Requirements
  • Examine the project scope and specific requirements that pertain to the subcontractor’s work.
  • Ensure you have a clear understanding of all tasks and deliverables expected from the subcontractor.
Step 2: Draft Subcontract Terms
  • Prepare a draft of the subcontract terms, including scope of work, payment schedule, deadlines, and any special conditions.
  • Include relevant details such as quality standards, safety requirements, and compliance with regulations.
Step 3: Consult with Subcontractor
  • Share the draft terms with the subcontractor for their review.
  • Arrange a meeting or call to discuss the terms and address any questions or concerns they may have.
Step 4: Negotiate Final Terms
  • Negotiate any necessary adjustments to the subcontract terms based on the subcontractor’s feedback.
  • Aim to reach a mutually agreeable set of terms that ensures clarity and fairness for both parties.
Step 5: Prepare Subcontract Documents
  • Once the terms are finalized, prepare the formal subcontract documents.
  • Ensure all agreed-upon terms are clearly stated and legally sound.
Step 6: Include Supporting Documentation
  • Attach any supporting documentation required for the subcontract, such as project plans, timelines, and specifications.
  • Ensure these documents are accurate and up-to-date.
Step 7: Internal Review and Approval
  • Submit the subcontract documents for internal review and approval.
  • Ensure relevant stakeholders sign off on the final terms before proceeding.
Step 8: Send Subcontract to Subcontractor
  • Send the finalized subcontract documents to the subcontractor for their signature.
  • Include clear instructions on how and when to return the signed documents.
Step 9: Confirm Receipt and Review
  • Follow up with the subcontractor to confirm receipt of the documents.
  • Address any final questions or concerns they may have before signing.
Step 10: Document and Record
  • Once the subcontract is signed by both parties, document the agreement in your CRM or project management system.
  • Ensure all relevant team members have access to the finalized subcontract and are aware of its terms.

Verify subcontractor availability and schedules

Step 1: Identify Required Subcontractors
  • List all subcontractors needed for the project, specifying their roles and the tasks they will be responsible for.
  • Ensure you have up-to-date contact information for each subcontractor.
Step 2: Review Project Timeline
  • Examine the project timeline to identify key milestones and deadlines relevant to the subcontractors’ work.
  • Determine the periods during which subcontractor services will be required.
Step 3: Contact Subcontractors
  • Reach out to each subcontractor via email or phone to discuss the project requirements and timeline.
  • Provide details on the scope of work, expected start and end dates, and any critical deadlines.
Step 4: Confirm Availability
  • Ask each subcontractor to confirm their availability for the project dates.
  • Ensure they understand the timeline and can commit to the required schedule.
Step 5: Discuss Schedules and Conflicts
  • Discuss any potential scheduling conflicts or concerns the subcontractors may have.
  • Work together to resolve any issues and adjust the schedule if necessary.
Step 6: Document Subcontractor Commitments
  • Record each subcontractor’s confirmed availability and schedule in your project management system.
  • Include start dates, end dates, and any specific timeframes for their tasks.
Step 7: Align Schedules with Project Timeline
  • Ensure that the subcontractors’ schedules align with the overall project timeline.
  • Make any necessary adjustments to avoid delays or conflicts.
Step 8: Communicate Schedule to Team
  • Inform the project team and relevant stakeholders of the confirmed subcontractor schedules.
  • Ensure everyone is aware of the subcontractors’ availability and planned work periods.
Step 9: Set Reminders for Follow-Up
  • Set reminders to follow up with subcontractors as the project start date approaches.
  • Confirm their continued availability and readiness to begin work on schedule.
Step 10: Monitor and Adjust
  • Regularly monitor the subcontractors’ progress and adherence to the schedule throughout the project.
  • Make adjustments as needed to address any delays or changes in availability.

Obtain GC signature on subcontract(s)

Step 1: Prepare Subcontract Documents
  • Ensure the subcontract documents are finalized and include all agreed-upon terms.
  • Double-check that all required sections are complete and accurate.
Step 2: Review with Internal Team
  • Conduct a final review of the subcontract documents with relevant internal team members.
  • Ensure everyone agrees that the documents are ready for GC signature.
Step 3: Obtain Signatures
  • Present the subcontract(s) to the GC for signature.
  • Ensure all required sections are signed and dated by the GC.
Step 4: Provide Copies to GC
  • Give the GC a copy of the signed subcontract(s) for their records.
  • Ensure the copies are clear and complete.
Step 5: Document the Signed Subcontract(s)
  • Record the signed subcontract(s) in your project management system.
  • Include details such as the date of signing and any important notes from the meeting.
Step 6: Store Original Documents Securely
  • Store the original signed subcontract(s) in a secure location.
  • Ensure they are easily accessible for future reference.
Step 7: Update Project Status
  • Update the project status in your CRM or project management system to reflect that the subcontract(s) have been signed.
  • Inform relevant team members that the GC’s signature has been obtained.

Conduct pre-construction site meeting with subcontractors

Step 1: Schedule the Meeting
  • Coordinate with all subcontractors to schedule a convenient time for the pre-construction site meeting.
  • Confirm the date, time, and location, and send out calendar invitations.
Step 2: Prepare Meeting Agenda
  • Draft a detailed agenda covering key topics to discuss, such as project scope, timelines, roles and responsibilities, safety protocols, and any site-specific considerations.
  • Share the agenda with all subcontractors prior to the meeting.
Step 3: Gather Necessary Documents
  • Collect all relevant documents, including project plans, schedules, subcontract agreements, and safety protocols.
  • Ensure you have enough copies for all attendees or make them accessible digitally.
Step 4: Set Up Meeting Space
  • Arrive early to set up the meeting space at the site.
  • Ensure the area is conducive to discussion and that any necessary equipment (e.g., projectors, whiteboards) is available and functioning.
Step 5: Introduce Attendees
  • Start the meeting by introducing yourself and any other key personnel.
  • Allow each subcontractor to introduce themselves and their role in the project.
Step 6: Review Project Scope and Objectives
  • Provide an overview of the project scope and objectives.
  • Highlight key deliverables, timelines, and any critical milestones.
Step 7: Discuss Roles and Responsibilities
  • Clarify the roles and responsibilities of each subcontractor.
  • Ensure everyone understands their tasks and how they fit into the overall project plan.
Step 8: Review Project Schedule
  • Walk through the project schedule, emphasizing start and end dates, critical paths, and key deadlines.
  • Discuss any potential scheduling conflicts and solutions.
Step 9: Address Site-Specific Considerations
  • Discuss any site-specific considerations, such as access points, storage areas, and any unique challenges.
  • Ensure all subcontractors are aware of and prepared for these conditions.
Step 10: Outline Safety Protocols
  • Review the safety protocols and requirements for the site.
  • Ensure all subcontractors understand and agree to comply with these protocols.
Step 11: Q&A Session
  • Allow time for subcontractors to ask questions and express any concerns.
  • Provide clear and concise answers to ensure everyone is on the same page.
Step 12: Document the Meeting
  • Record detailed minutes of the meeting, capturing key discussions, decisions, and action items.
  • Distribute the meeting minutes to all attendees and relevant stakeholders.

Review permitting requirements

Step 1: Identify Required Permits
  • Determine the types of permits required for the roofing project, such as building permits, zoning permits, or environmental permits.
  • Consult local building codes and regulations to ensure compliance.
Step 2: Contact Local Authorities
  • Reach out to local building departments or permitting authorities to confirm the specific requirements for your project.
  • Obtain information on application procedures, necessary documentation, and associated fees.
Step 3: Create a Permit Checklist
  • Develop a checklist outlining all the permits needed and the corresponding documentation for each.
  • Include deadlines for submission and any special conditions that must be met.

Procure permit (if necessary)

Step 1: Gather Required Documentation
  • Collect all necessary documents for the permit application, such as project plans, site assessments, and contractor licenses.
  • Ensure all documents are accurate and complete.
Step 2: Complete Permit Applications
  • Fill out the permit application forms as required by the local authorities.
  • Ensure all information is accurate and all required fields are completed.
Step 3: Submit Permit Applications
  • Submit the completed permit applications to the appropriate local authorities.
  • Confirm the submission method (e.g., online, in-person, mail) and retain proof of submission.
Step 4: Pay Application Fees
  • Pay any required application fees as specified by the permitting authorities.
  • Keep receipts or proof of payment for your records.
Step 5: Track Application Status
  • Monitor the status of your permit applications.
  • Maintain regular contact with the permitting authorities to ensure timely processing and address any issues or additional requirements that arise.
Step 6: Receive and Verify Permits
  • Once the permits are issued, verify that all information is correct and that the permits cover all aspects of the project.
  • Ensure there are no errors or omissions.
Step 7: Store Permits Securely
  • Store the approved permits in a secure location, both physically and digitally.
  • Ensure they are easily accessible for future reference and inspections.
Step 8: Update Project Documentation
  • Record the details of the approved permits in your project management system.
  • Include information such as approval dates, permit numbers, and any conditions or comments from the authorities.
Step 9: Communicate Permit Approval to Team
  • Inform the project team that the necessary permits have been procured.
  • Ensure everyone involved in the project is aware of the permit conditions and any related compliance requirements.

Create site safety plan

Step 1: Identify Potential Hazards
  • Conduct a thorough assessment of the roofing site to identify potential hazards.
  • Consider factors such as fall risks, weather conditions, electrical hazards, and material handling.
Step 2: Review Safety Regulations
  • Review relevant safety regulations and standards, such as OSHA guidelines for roofing work.
  • Ensure your safety plan complies with all legal requirements.
Step 3: Define Safety Procedures
  • Develop specific safety procedures to address the identified hazards.
  • Include fall protection measures, proper use of personal protective equipment (PPE), safe material handling practices, and emergency response procedures.
Step 4: Assign Safety Roles and Responsibilities
  • Designate safety roles and responsibilities to team members.
  • Ensure each person understands their duties, such as safety monitoring, first aid, and equipment inspections.
Step 5: Develop a Site Layout Plan
  • Create a site layout plan that highlights safety zones, access points, and equipment storage areas.
  • Ensure clear pathways and emergency exits are marked.
Step 6: Specify PPE Requirements
  • List all required PPE for the roofing project, such as helmets, harnesses, gloves, and safety glasses.
  • Ensure all team members are aware of the PPE requirements and how to use them properly.
Step 7: Establish Communication Protocols
  • Define communication protocols for reporting safety concerns and incidents.
  • Ensure all team members know how to quickly and effectively communicate any issues.
Step 8: Include Emergency Procedures
  • Develop detailed emergency procedures for situations such as falls, severe weather, and equipment malfunctions.
  • Ensure all team members are trained on these procedures and know where emergency equipment is located.
Step 9: Conduct Safety Training
  • Organize safety training sessions for all team members.
  • Ensure everyone understands the safety plan, procedures, and their individual responsibilities.
Step 10: Document and Distribute the Plan
  • Document the site safety plan in a clear and accessible format.
  • Distribute the plan to all team members and relevant stakeholders.
  • Ensure it is easily accessible on-site for quick reference.

Create fall protection plan

Step 1: Create fall protection plan
  • Conduct a thorough assessment of the roofing site to identify potential fall hazards.
  • Focus on areas such as roof edges, skylights, roof openings, and ladders.
Step 2: Review Regulatory Requirements
  • Review relevant fall protection regulations and standards, such as OSHA guidelines for roofing work.
  • Ensure your fall protection plan complies with all legal requirements.
Step 3: Select Appropriate Fall Protection Systems
  • Determine the most suitable fall protection systems for the identified hazards.
  • Options may include guardrails, safety nets, personal fall arrest systems, and warning line systems.
Step 4: Define Safe Work Procedures
  • Develop specific procedures for safe work practices to prevent falls.
  • Include guidelines for using fall protection equipment, accessing and egressing the roof, and working near roof edges.
Step 5: Assign Responsibilities
  • Designate fall protection responsibilities to team members.
  • Ensure each person understands their duties, such as inspecting equipment, setting up fall protection systems, and monitoring compliance.
Step 6: Specify PPE Requirements
  • List all required personal protective equipment (PPE) for fall protection, such as harnesses, lanyards, and anchor points.
  • Ensure all team members are trained on the proper use and maintenance of PPE.
Step 7: Develop Rescue Procedures
  • Create detailed rescue procedures for situations where a fall occurs.
  • Include steps for safely retrieving a fallen worker and providing first aid.
Step 8: Conduct Fall Protection Training
  • Organize fall protection training sessions for all team members.
  • Ensure everyone understands the fall protection plan, the use of equipment, and their individual responsibilities.
Step 9: Install Fall Protection Systems
  • Ensure the installation of fall protection systems according to the plan.
  • Verify that all systems are properly set up and functioning before work begins.
Step 10: Inspect and Maintain Equipment
  • Establish a routine inspection and maintenance schedule for fall protection equipment.
  • Ensure all equipment is in good condition and safe to use.
Step 11: Document and Distribute the Plan
  • Document the fall protection plan in a clear and accessible format.
  • Distribute the plan to all team members and relevant stakeholders.
  • Ensure it is easily accessible on-site for quick reference.

Establish project communication plan

Step 1: Identify Communication Needs
  • Determine the communication needs for the project, including the types of information that need to be shared, such as project updates, schedule changes, and safety alerts.
  • Consider the stakeholders involved, such as the project team, subcontractors, and the GC.
Step 2: Define Communication Methods
  • Select the appropriate communication methods for the project, such as email, phone calls, text messages, project management software, and in-person meetings.
  • Ensure the chosen methods are accessible and convenient for all stakeholders.
Step 3: Establish Communication Schedule
  • Create a communication schedule that outlines when and how often updates and meetings will occur.
  • Include regular progress meetings, daily briefings, and emergency communication protocols.
Step 4: Develop Standardized Templates
  • Create standardized templates for common communication needs, such as project updates, meeting agendas, and safety alerts.
  • Ensure templates are clear, concise, and easy to use.
Step 5: Set Up Communication Channels
  • Ensure all communication channels are set up and functioning properly.
  • Provide access and training to all team members on how to use the chosen communication tools.
Step 6: Define Information Flow
  • Establish a clear flow of information to ensure that updates and important messages reach all relevant stakeholders.
  • Specify how information will be documented, shared, and stored.
Step 7: Implement Feedback Mechanisms
  • Develop feedback mechanisms to allow team members and stakeholders to provide input and ask questions.
  • Ensure there is a process for addressing and responding to feedback promptly.
Step 8: Conduct Communication Training
  • Organize training sessions for all team members on the communication plan and tools.
  • Ensure everyone understands their roles, responsibilities, and the importance of effective communication.
Step 9: Monitor and Adjust the Plan
  • Regularly monitor the effectiveness of the communication plan and make adjustments as needed.
  • Seek feedback from the team and stakeholders to continuously improve communication processes.

Prepare equipment for mobilization

Step 1: Inventory Equipment
  • Create a detailed inventory of all equipment required for the roofing project.
  • Include tools, machinery, safety gear, and any other essential items.
Step 2: Inspect Equipment
  • Conduct a thorough inspection of all equipment to ensure it is in good working condition.
  • Check for any signs of wear, damage, or malfunction and address any issues immediately.
Step 3: Perform Maintenance
  • Perform any necessary maintenance or repairs on the equipment.
  • Ensure all machinery is serviced, tools are sharpened, and safety gear is compliant with regulations.
Step 4: Gather Required Accessories and Supplies
  • Collect all necessary accessories and supplies, such as fuel, lubricants, spare parts, and batteries.
  • Ensure you have sufficient quantities to avoid interruptions during the project.
Step 5: Organize Equipment for Transport
  • Organize the equipment in a logical order for transport to the site.
  • Group similar items together and ensure all smaller tools and accessories are securely packed.
Step 6: Secure Transportation
  • Arrange for transportation of the equipment to the project site.
  • Ensure the transport vehicle is suitable for the load and complies with safety regulations.
Step 7: Load Equipment Safely
  • Load the equipment onto the transport vehicle, ensuring it is securely fastened and protected from damage during transit.
  • Use proper lifting techniques and equipment to avoid injuries.
Step 8: Prepare Equipment Documentation
  • Prepare all necessary documentation for the equipment, including inventory lists, maintenance records, and user manuals.
  • Ensure these documents are accessible to the team on-site.
Step 9: Communicate Mobilization Plan
  • Inform the project team and relevant stakeholders of the mobilization plan.
  • Provide details on transportation schedules, equipment handling procedures, and contact information for any issues.
Step 10: Verify Site Readiness
  • Confirm that the project site is ready to receive the equipment.
  • Ensure there is adequate space for unloading and storing the equipment securely upon arrival.

Conduct final pre-construction site visit to verify readiness

Step 1: Schedule the Site Visit
  • Coordinate with key stakeholders to schedule the final pre-construction site visit.
  • Confirm the date and time, and ensure all necessary participants, such as project managers, supervisors, and key subcontractors, are informed.
Step 2: Review Pre-Visit Checklist
  • Prepare a checklist of items to verify during the site visit, including site preparation, roofing equipment, safety measures, and materials.
  • Ensure the checklist is comprehensive and covers all critical aspects of the roofing project.
Step 3: Gather Necessary Documentation
  • Collect all relevant project documents, such as site plans, roofing permits, safety plans, and material lists.
  • Bring copies of these documents to the site visit for reference.
Step 4: Inspect Roof Preparation
  • Verify that the roof is prepared for construction, including the removal of any debris or obstacles.
  • Ensure that access points to the roof, such as ladders or scaffolding, are secure and stable.
Step 5: Verify Equipment and Material Delivery
  • Check that all necessary roofing equipment and materials, such as shingles, tiles, underlayment, and fasteners, have been delivered to the site.
  • Confirm that everything is in good condition, properly stored, and protected from weather conditions.
Step 6: Review Safety Measures
  • Ensure that all safety measures are in place, including fall protection systems (e.g., guardrails, harnesses, safety nets), safety signage, and PPE for workers.
  • Verify that emergency procedures and first aid supplies are available and accessible on the roof and ground.
Step 7: Confirm Utility Connections
  • Verify that all necessary utility connections, such as electricity for roofing equipment, are available and functioning.
  • Ensure that temporary utilities, if needed, are in place and operational.
Step 8: Assess Site Logistics
  • Review the site logistics, including equipment staging areas, material storage, and worker facilities.
  • Ensure that the layout is organized and efficient for the roofing construction process.
Step 9: Discuss with Team Members
  • Engage with team members and subcontractors present at the site.
  • Address any last-minute questions or concerns and confirm that everyone is ready to start roofing work.
Step 10: Document Findings
  • Record detailed notes on the findings of the site visit.
  • Include photographs of critical areas and any issues that need to be addressed, especially potential hazards on the roof.
Step 11: Communicate Readiness
  • Report the findings of the site visit to the project team and relevant stakeholders.
  • Confirm that the site is ready for roofing construction to begin and outline any actions needed to address outstanding issues.

Enter Site Mobilization Date in Subtrak

Step 1: Navigate to the Projects page

Click on Projects on the main side navigation bar.

Step 2: Select the appropriate project from the Projects list
Step 3: Click on Project Info

Project info is located under the Project name on the individual Project page.

 

Step 4: Edit the Project info

In the top right corner of the Project info window, click Edit

Step 5: Enter the corresponding Site Mobilization Date

Step 6: Save the Site Mobilization Date

In the top right corner of the Project info window, click Save.