Construction Workflow
Mobilize roofing crew and set up equipment on site
Step 1: Conduct Pre-Mobilization Meeting
Gather the crew to discuss the project scope, safety protocols, and individual responsibilities. Ensure everyone understands the project timeline and objectives.
Step 2: Inspect Equipment and PPE
Check all equipment for functionality and safety compliance. Ensure all crew members have the necessary PPE, including hard hats, gloves, and harnesses.
Step 3: Transport Equipment to Site
Load equipment onto transport vehicles, ensuring it is securely fastened. Use appropriate lifting techniques to prevent injury.
Step 4: Set Up Safety Barriers
Upon arrival, set up safety barriers around the work area to protect the crew and the public. Ensure all barriers are clearly visible and stable.
Step 5: Assemble Scaffolding and Ladders
Assemble scaffolding according to manufacturer instructions, ensuring it is level and secure. Position ladders at a safe angle and check for stability.
Step 6: Conduct Safety Briefing
Hold a safety briefing to review potential hazards and emergency procedures. Ensure all crew members are aware of their roles in maintaining a safe work environment.
Step 7: Verify Communication Equipment
Check that all communication devices are operational. Establish a communication protocol for the crew to follow during the project.
Step 8: Begin Work
Once all equipment is set up and safety measures are in place, the crew can begin work on the restoration project. Monitor the site continuously for safety and efficiency.
Conduct site safety briefing with roofing crew
Step 1: Prepare safety materials
Gather all necessary safety materials including the site-specific safety plan, emergency contact list, and personal protective equipment (PPE) such as hard hats, gloves, and safety harnesses. Ensure that all materials are up-to-date and comply with regional safety regulations.
Step 2: Assemble the roofing crew
Ensure all crew members are present and accounted for. Conduct a roll call if necessary. Choose a location that is safe and free from distractions for the briefing.
Step 3: Review the safety plans
Go over the site-specific safety plan in detail. Highlight key areas such as fall protection measures, electrical safety, and weather-related precautions. Use visual aids if available to enhance understanding.
Step 4: Distribute PPE
Hand out personal protective equipment to each crew member. Ensure that everyone knows how to properly use and maintain their PPE. Check that all equipment fits correctly and is in good condition.
Step 5: Explain emergency procedures
Detail the emergency procedures including evacuation routes, assembly points, and the location of first aid kits. Ensure everyone knows who the designated first aid responders are and how to contact emergency services.
Step 6: Outline safe work practices
Discuss safe work practices specific to roofing and storm damage restoration. Emphasize the importance of maintaining a clean work area, using tools correctly, and being aware of surroundings at all times.
Step 7: Encourage questions and feedback
Invite crew members to ask questions or provide feedback on the safety procedures. Address any concerns or suggestions they may have. This helps ensure everyone is on the same page and feels comfortable with the safety measures.
Step 8: Document the briefing
Record the details of the briefing including the date, time, attendees, and topics covered. Use a standardized form if available. This documentation is important for compliance and future reference.
Verify delivery and inventory of maintenance materials and equipment
Step 1: Review Delivery Schedules and Confirm Expected Arrivals
-
Review the delivery schedules and confirm the expected arrival times of all maintenance materials and equipment with suppliers
-
Coordinate with the logistics team to ensure that deliveries align with the project timeline and on-site requirements
Step 2: Inspect Delivered Materials for Quantity and Quality
-
Inspect all delivered materials for quantity and quality, comparing them with the order specifications and supplier invoices
-
Confirm that there are no damaged items or discrepancies, and report any issues to the supplier immediately
Step 3: Check Equipment for Functionality and Safety Compliance
-
Check all delivered equipment for functionality and safety compliance, performing routine tests to verify that they are in proper working condition
-
Address any maintenance or repair needs before the equipment is used on-site
Step 4: Organize and Store Materials in Designated Areas
-
Organize and store materials in designated storage areas, ensuring that they are secure, accessible, and clearly labeled
-
Implement security measures to prevent unauthorized access or theft of valuable materials
Step 5: Update Inventory Records and Confirm Receipt with Suppliers
-
Update inventory records to reflect the delivered materials and equipment, noting the quantities, specifications, and storage locations
-
Confirm receipt of all items with suppliers and obtain signed delivery notes for reference
Step 6: Communicate Material and Equipment Availability to the Project Team
-
Communicate the availability of materials and equipment to the project team, highlighting any critical items or pending deliveries
-
Confirm that all team members understand the current inventory status and are ready to proceed with scheduled tasks
Step 7: Document Delivery and Inventory Checks in Project Records
-
Document all delivery and inventory checks in the project records, including photos, signed delivery notes, and inspection reports
Prepare roof surface for maintenance (e.g., clean, inspect)
Step 1: Conduct a Visual Inspection of the Roof Surface
-
Conduct a visual inspection of the roof surface to identify any visible damage, debris, or structural issues that may affect maintenance activities
-
Take detailed notes on key areas that require cleaning, repair, or further inspection
Step 2: Clear Debris and Remove Any Obstructions from the Roof
-
Clear debris and remove any obstructions from the roof, such as leaves, branches, old fasteners, or broken tiles
-
Use appropriate tools, such as brooms, blowers, or vacuums, to achieve a clean and safe working surface
Step 3: Inspect the Roof’s Structural Integrity and Fasteners
-
Inspect the roof’s structural integrity, focusing on key areas such as support beams, joints, and fasteners
-
Check for signs of wear, corrosion, or looseness, and address any issues before proceeding with maintenance work
Step 4: Check for Signs of Water Damage or Leaks
-
Check for signs of water damage, leaks, or moisture buildup on the roof surface, using tools such as moisture meters or thermal imaging if necessary
-
Note any areas that require sealing or repair to prevent future issues
Step 5: Prepare the Roof Surface for the Application of Maintenance Materials
-
Prepare the roof surface for the application of maintenance materials, such as sealants, coatings, or protective layers
-
Ensure that the surface is dry, smooth, and free of any contaminants that could affect material adhesion
Step 6: Document the Roof Preparation Process and Inspection Findings
-
Document the roof preparation process and inspection findings in project records, including photos and notes on key areas of concern
-
Save the documentation for reference during maintenance activities
Step 7: Communicate the Completion of Roof Preparation to the Project Team
-
Communicate the completion of roof preparation to the project team, confirming that the surface is ready for maintenance work to proceed
Perform roof inspection and identify maintenance tasks
Step 1: Conduct a Comprehensive Visual Inspection of the Roof
-
Conduct a comprehensive visual inspection of the roof to assess its overall condition, focusing on key areas such as shingles, tiles, metal panels, flashing, and penetrations
-
Use a detailed inspection checklist to guide your assessment and ensure thorough coverage
Step 2: Check for Signs of Damage, Wear, or Deterioration
-
Check for signs of damage, wear, or deterioration, such as cracks, missing or loose materials, discoloration, and signs of moisture intrusion
-
Take detailed notes and photos of any areas requiring maintenance or repair
Step 3: Use Specialized Tools to Identify Hidden Issues
-
Use specialized tools, such as moisture meters, infrared cameras, or drones, to identify hidden issues that may not be visible to the naked eye
-
Document any anomalies or potential problem areas for further investigation
Step 4: Evaluate the Roof’s Structural Integrity and Drainage Systems
-
Evaluate the roof’s structural integrity and drainage systems, checking for issues like sagging, improper slope, blocked drains, or damaged gutters
-
Confirm that all drainage components are functioning correctly and efficiently
Step 5: Identify Specific Maintenance Tasks Required
-
Identify specific maintenance tasks required based on the inspection findings, such as replacing damaged materials, sealing leaks, or clearing debris
-
Prioritize tasks based on severity, urgency, and client requirements
Step 6: Communicate Inspection Findings to the Project Team
-
Communicate the inspection findings to the project team, highlighting key areas of concern and recommended maintenance actions
-
Confirm that the team understands the scope of tasks to be addressed
Step 7: Document Inspection Results and Recommended Tasks in Project Records
-
Document the inspection results and recommended tasks in project records, including notes, photos, and a prioritized list of maintenance activities
Repair or replace any damaged roofing materials
Step 1: Review the Inspection Report to Identify Damaged Areas
-
Review the inspection report to identify areas with damaged roofing materials, such as missing shingles, cracked tiles, or worn metal panels
-
Confirm the specific materials needed for each repair or replacement task
Step 2: Gather and Transport Necessary Materials to the Work Area
-
Gather and transport the necessary materials, tools, and safety equipment to the work area, ensuring that everything is easily accessible to the crew
-
Double-check that all replacement materials match the existing roof type and color
Step 3: Remove Damaged Materials Carefully
-
Remove damaged roofing materials carefully, using the appropriate tools and techniques to avoid causing further damage to the surrounding areas
-
Dispose of removed materials in designated waste containers following safety and environmental guidelines
Step 4: Install Replacement Materials According to Manufacturer Guidelines
-
Install replacement materials according to manufacturer guidelines and industry standards, ensuring that each piece is properly aligned and securely fastened
-
Pay special attention to areas prone to leaks, such as roof edges, valleys, and penetrations
Step 5: Inspect and Verify the Quality of the Repair Work
-
Inspect and verify the quality of the repair work, checking for secure installation, proper alignment, and adherence to project specifications
-
Make any necessary adjustments or touch-ups to achieve a professional finish
Step 6: Communicate Completion of Repairs to the Project Team
-
Communicate the completion of repairs to the project team, confirming that all identified areas have been successfully addressed
-
Update the project team on any additional issues discovered during the repairs
Step 7: Document Repair Activities and Materials Used in Project Records
-
Document all repair activities and materials used in the project records, including notes, photos, and a summary of completed tasks
Clear debris and clean roof drains and gutters
Step 1: Conduct a Preliminary Inspection of Drains and Gutters
-
Conduct a preliminary inspection of roof drains and gutters to identify areas with accumulated debris, blockages, or damage
-
Take note of any issues that require immediate attention, such as clogged downspouts or sagging gutters
Step 2: Gather Necessary Tools and Safety Equipment for Cleaning
-
Gather the necessary tools and safety equipment for cleaning drains and gutters, such as ladders, gloves, gutter scoops, and waste containers
-
Ensure that all crew members are equipped with appropriate personal protective equipment (PPE)
Step 3: Clear Debris from Gutters, Drains, and Downspouts
-
Clear debris from gutters, drains, and downspouts, using gutter scoops, brushes, or pressure washers as needed to remove dirt, leaves, and other obstructions
-
Confirm that all water flow pathways are clear and free of blockages
Step 4: Inspect for Damage and Make Minor Repairs as Needed
-
Inspect the cleaned drains and gutters for any signs of damage, such as cracks, rust, or loose fasteners
-
Make minor repairs as needed to restore the structural integrity and functionality of the drainage system
Step 5: Test Drainage System Functionality After Cleaning
-
Test the drainage system functionality after cleaning by running water through the gutters and drains to confirm proper flow
-
Check for leaks, pooling water, or slow drainage and address any issues identified
Step 6: Dispose of Debris in Designated Waste Containers
-
Dispose of all collected debris in designated waste containers, following environmental guidelines for waste disposal and recycling
-
Ensure that the site is clean and free of hazards after the cleaning process
Step 7: Document Cleaning Activities and Issues Identified in Project Records
-
Document all cleaning activities and any issues identified in project records, including notes, photos, and a summary of completed tasks
Apply protective coatings or treatments as specified
Step 1: Review Manufacturer Guidelines and Specifications
-
Review the manufacturer guidelines and specifications for the protective coatings or treatments to be applied, confirming the required application techniques and drying times
-
Verify that all specified materials are approved for the roof type and conditions
Step 2: Prepare the Roof Surface for Coating or Treatment
-
Prepare the roof surface for coating or treatment, ensuring that it is clean, dry, and free of any debris, dust, or contaminants
-
Conduct a final inspection to confirm that all necessary repairs have been completed before starting the application
Step 3: Gather and Prepare Application Tools and Materials
-
Gather and prepare all necessary application tools and materials, such as rollers, brushes, sprayers, and protective coverings for surrounding areas
-
Confirm that all crew members have the required personal protective equipment (PPE)
Step 4: Apply the Protective Coating or Treatment Evenly
-
Apply the protective coating or treatment evenly, following the manufacturer’s guidelines for application thickness, technique, and coverage area
-
Monitor the application to ensure consistency and adherence to quality standards
Step 5: Allow Sufficient Drying or Curing Time
-
Allow sufficient drying or curing time based on the manufacturer’s recommendations, ensuring that no work is carried out on or around the treated areas during this period
-
Use signage or barriers to restrict access and prevent accidental damage
Step 6: Inspect the Coated Surface for Quality and Coverage
-
Inspect the coated surface for quality and coverage, confirming that the entire area has been properly treated and there are no missed spots or irregularities
-
Make any necessary touch-ups to achieve a consistent finish
Step 7: Document the Application Process and Quality Checks in Project Records
-
Document the application process and quality checks in project records, including notes, photos, and a summary of completed tasks
Install or repair flashing and roof penetrations
Step 1: Review Flashing and Penetration Installation Plans
-
Review the installation plans for flashing and roof penetrations, confirming the locations, materials, and techniques required for each area
-
Verify that all necessary materials and tools are available on-site
Step 2: Prepare Roof Penetration Areas for Flashing Installation
-
Prepare the roof penetration areas for flashing installation by cleaning and inspecting the surrounding surfaces for damage or irregularities
-
Confirm that all penetrations are properly sealed and reinforced before installing flashing
Step 3: Install Base Flashing for Roof Penetrations
-
Install base flashing for roof penetrations, securing it in place with appropriate fasteners and sealants
-
Ensure that the flashing extends adequately under the roofing material to provide a watertight barrier
Step 4: Apply Counter-Flashing for Additional Protection
-
Apply counter-flashing for additional protection at key locations such as chimneys, dormers, and sidewalls
-
Verify that the counter-flashing overlaps the base flashing properly and is securely fastened
Step 5: Seal Joints and Seams to Prevent Water Infiltration
-
Seal all joints and seams between the flashing and roofing materials using high-quality sealants or adhesive membranes
-
Check for gaps, overlaps, or exposed edges that could lead to leaks
Step 6: Inspect Flashing Installation for Proper Coverage and Alignment
-
Inspect the flashing installation for proper coverage, alignment, and compliance with project specifications
-
Make any necessary adjustments to ensure a secure and watertight seal
Step 7: Document Flashing Installation and Repairs in Project Records
-
Document the flashing installation and repairs in project records, including photos, notes, and quality inspection reports for future reference
Conduct weekly quality control inspections
Step 1: Schedule the inspection
Coordinate with the project manager to schedule the inspection at a time that minimizes disruption to ongoing work. Ensure all relevant personnel are informed of the inspection schedule.
Step 2: Prepare the inspection checklist
Develop a comprehensive checklist that includes all critical aspects of the roofing installation, such as material quality, installation techniques, and safety compliance. Use previous inspection reports to update the checklist as needed.
Step 3: Gather necessary tools
Ensure you have all necessary tools for the inspection, including a camera for documentation, a tape measure, a flashlight, and personal protective equipment (PPE) such as a hard hat and safety glasses.
Step 4: Conduct a visual inspection
Walk the entire roof surface to visually inspect for any signs of damage, improper installation, or material defects. Pay special attention to seams, flashing, and penetrations.
Step 5: Check the insulation quality
Verify that the insulation is installed correctly and is free from moisture or compression. Ensure that the R-value meets the project specifications.
Step 6: Assess safety and compliance
Ensure all safety measures are in place, including fall protection systems and proper signage. Check that all work complies with OSHA standards and local building codes.
Step 7: Evaluate site cleanliness
Inspect the site for debris and ensure that all waste materials are properly disposed of. A clean site is essential for safety and efficiency.
Step 8: Document findings
Record all findings in a detailed report, including photographs and notes on any issues identified. Use a standardized format to ensure consistency.
Step 9: Communicate findings to the crew
Hold a meeting with the crew to discuss the inspection results. Highlight areas of concern and provide guidance on corrective actions needed.
Step 10: Follow up on corrections
Schedule a follow-up inspection to verify that all corrective actions have been completed. Update the inspection report to reflect the status of these corrections.
Perform site cleanup and waste disposal of roofing materials
Step 1: Identify Cleanup Areas
Survey the site to identify all areas requiring cleanup, including the roof and ground level. Mark these areas clearly to ensure comprehensive coverage.
Step 2: Gather Cleanup Supplies
Collect necessary supplies such as heavy-duty trash bags, brooms, shovels, gloves, and safety goggles. Ensure all team members have personal protective equipment (PPE).
Step 3: Sort Waste Materials
Separate waste into categories: recyclable materials, non-recyclable waste, and hazardous materials. Use labeled containers to avoid cross-contamination.
Step 4: Remove Debris from Roof
Carefully remove debris from the roof using brooms and shovels. Lower debris to the ground using a chute or bucket to prevent damage to the property.
Step 5: Collect Ground Level Debris
Gather debris from the ground, ensuring all waste is collected. Use rakes and brooms to ensure thorough cleanup.
Step 6: Dispose of Waste Properly
Transport non-recyclable waste to a designated landfill. Follow local regulations for disposal of hazardous materials.
Step 7: Recycle Materials
Take recyclable materials to a recycling facility. Ensure materials are clean and sorted according to facility requirements.
Step 8: Store and Return Unused Materials
Store unused materials in a secure location. Return any rented equipment to the supplier. Ensure all materials are accounted for.
Step 9: Inspect Final Cleanup
Conduct a final inspection of the site to ensure all debris is removed and the area is clean. Address any missed areas immediately.
Step 10: Document Cleanup Activities
Take photos of the cleaned areas and document the cleanup process. Notify the supervisor of completion and any issues encountered.
Conduct final inspection of the roofing maintenance work
Step 1: Schedule the Final Inspection with the Project Team
-
Schedule the final inspection with the project team, confirming the inspection date, time, and key participants, such as the project manager, quality control officer, and client representative
-
Ensure that all necessary documents and inspection tools are prepared in advance
Step 2: Use a Comprehensive Final Inspection Checklist
-
Use a comprehensive final inspection checklist to systematically review key areas, such as roofing materials, flashing, drainage systems, and overall workmanship
-
Include specific criteria for each item to confirm compliance with project specifications
Step 3: Inspect Each Section of the Roof for Quality and Compliance
-
Inspect each section of the roof thoroughly for quality and compliance with the agreed-upon maintenance plan and specifications
-
Take detailed notes and photos of any remaining issues that need to be addressed
Step 4: Document Any Issues and Assign Action Items
-
Document any issues discovered during the final inspection and assign action items to relevant team members to correct them promptly
-
Confirm deadlines for completing corrective actions and follow up as needed
Step 5: Verify Completion of All Corrective Actions
-
Verify the completion of all corrective actions identified during the final inspection, ensuring that each task meets quality standards and project requirements
-
Update the checklist to reflect completed items and confirm readiness for client review
Step 6: Communicate Final Inspection Results to the Client and Project Team
-
Communicate the results of the final inspection to the client and project team, highlighting areas of excellence and any minor adjustments needed
-
Confirm the next steps for closing out the project or preparing for a client walkthrough
Step 7: Save the Final Inspection Report in Project Records
-
Save the final inspection report in project records and CRM, linking it to the client’s file for reference during future communications and project closeout
Notify client that roofing maintenance work is substantially complete
Step 1: Prepare a Summary of Completed Maintenance Work
-
Prepare a summary of the completed maintenance work, including key tasks, repairs, inspections, and final adjustments
-
Organize the summary into a clear and concise format for easy client review
Step 2: Contact the Client to Provide Completion Update
-
Contact the client to provide an update on the completion of the roofing maintenance work, using their preferred communication method (e.g., phone, email, or in-person meeting)
-
Confirm that the client is aware of the progress and ready for a final walkthrough or inspection
Step 3: Invite the Client to Schedule a Final Walkthrough
-
Invite the client to schedule a final walkthrough to review the completed work, addressing any last-minute questions or concerns they may have
-
Offer multiple date and time options to accommodate the client’s schedule
Step 4: Provide Key Documentation for Client Review
-
Provide key documentation for the client’s review, such as the final inspection report, quality control checklists, warranty information, and before-and-after photos
-
Confirm that the client has received all necessary documents and understands their purpose
Step 5: Confirm the Client’s Satisfaction with the Completed Work
-
Confirm the client’s satisfaction with the completed work, inviting them to raise any final concerns or requests for adjustments
-
Reassure the client that you are available to address any issues promptly
Step 6: Document the Client Communication and Completion Status in Project Records
-
Document the client communication and completion status in project records and CRM, linking it to the client’s file for reference during the final walkthrough or closeout
Step 7: Notify the Project Team of Client Communication and Next Steps
-
Notify the project team of the client communication and confirm the next steps for finalizing the project or scheduling a walkthrough