Closeout Workflow
Welcome to the Closeout Workflow SOP Template Library for Roof Replacement (Residential). Access free, expertly crafted Standard Operating Procedures for the closeout phase of your projects. Our templates cover final inspections, documentation, and client handover, ensuring a smooth and thorough project completion. Download our templates today to streamline your closeout process and leave a lasting positive impression.
Schedule final walkthrough with the client and project manager
Step 1: Coordinate Final Walkthrough Date
• Communicate with the client and project manager to agree on a date and time for the final walkthrough
• Send calendar invitations to confirm the schedule
Step 2: Prepare Walkthrough Checklist
• Create a checklist of key areas and tasks to review during the final walkthrough
• Include items related to quality, safety, and functionality
Step 3: Review Project Documentation
• Organize all relevant project documentation, including inspection reports and client communications
• Ensure documents are ready for reference during the walkthrough
Step 4: Conduct a Pre-Walkthrough Inspection
• Perform a pre-walkthrough inspection with the project team to identify any last-minute issues
• Address any concerns before the client arrives
Step 5: Confirm Final Walkthrough Agenda
• Review the final walkthrough agenda with the project manager
• Ensure that all key topics and areas are covered in the agenda
Step 6: Communicate Walkthrough Plan to Client
• Provide the client with an overview of the walkthrough plan
• Confirm the client’s understanding and agreement with the agenda
Step 7: Reconfirm Final Walkthrough Schedule
• Send a reminder to the client and project manager one day before the walkthrough
• Reconfirm the date, time, and meeting location
Conduct final inspection to ensure all roofing work is completed to client's satisfaction
Step 1: Review Project Scope and Punch List
• Revisit the original project scope and punch list to identify key areas for final inspection
• Note any items flagged by the client or project manager
Step 2: Inspect Roofing Work for Quality
• Inspect all roofing work in detail to confirm that it meets quality standards and project specifications
• Check for any defects or issues in the installation
Step 3: Verify Functionality of Key Roofing Elements
• Test key roofing elements such as drainage systems, flashing, and penetrations
• Confirm that all elements are functioning correctly
Step 4: Review Safety and Compliance Measures
• Verify that all safety measures and compliance requirements have been met
• Check that all final safety protocols are documented
Step 5: Discuss Final Inspection Findings with Client
• Present the findings of the final inspection to the client
• Address any questions or concerns raised by the client
Step 6: Confirm Client Satisfaction
• Ask the client to confirm their satisfaction with the completed roofing work
• Provide them with the opportunity to request final adjustments
Step 7: Document Final Inspection Results
• Record the results of the final inspection in project documentation
• File a copy of the final inspection report for future reference
Address any last-minute concerns or issues raised by the client
Step 1: Schedule a Meeting with the Client
• Arrange a meeting or call with the client to discuss any last-minute concerns
• Confirm the meeting time and location with the client in advance
Step 2: Listen to Client's Concerns
• Allow the client to express any final issues, concerns, or suggestions
• Take detailed notes to ensure each concern is clearly understood
Step 3: Assess the Client's Concerns
• Assess the validity and impact of the client’s concerns
• Determine if the issues are related to quality, functionality, or safety
Step 4: Develop a Plan of Action
• Develop a specific plan to address each concern raised by the client
• Prioritize urgent issues and allocate resources accordingly
Step 5: Communicate the Plan to the Client
• Present the plan of action to the client for approval
• Provide clear explanations and timelines for resolving each concern
Step 6: Implement the Action Plan
• Assign tasks to relevant team members or subcontractors to address the client’s concerns
• Confirm that all corrective actions are completed promptly
Step 7: Follow Up with Client for Confirmation
• Follow up with the client to confirm that their concerns have been fully addressed
• Document the client’s satisfaction with the final results
Complete all remaining documentation and paperwork for roofing work
Step 1: Review Required Documentation
• Review the list of required documents and paperwork for the roofing project
• Confirm that all necessary documents have been completed and signed
Step 2: Compile Final Inspection Reports
• Compile the final inspection reports, including photographs and notes
• Ensure all reports are signed by the project manager and relevant stakeholders
Step 3: Verify Compliance Documentation
• Verify that all compliance documentation is complete, including permits, inspection records, and regulatory approvals
• Check that all documents meet local regulations
Step 4: Organize Project Files
• Organize all project files in a central location, both digitally and physically
• Include inspection reports, punch lists, client communications, and approvals
Step 5: Prepare Final Project Report
• Prepare a comprehensive final project report summarizing key milestones, inspections, and approvals
• Include an overview of the completed roofing work
Step 6: Review Documentation with Project Manager
• Review all final documentation with the project manager to confirm completeness and accuracy
• Make any necessary adjustments or updates
Step 7: File and Archive All Project Documentation
• File and archive all project documentation for future reference
• Ensure digital copies are backed up securely
Ensure all warranties and manuals related to roofing are compiled and provided to the client
Step 1: Collect Manufacturer Warranties
• Collect all manufacturer warranties for roofing materials, such as shingles, flashing, and underlayment
• Confirm that each warranty includes coverage details and expiration dates
Step 2: Compile Contractor Warranties
• Compile any contractor-provided warranties for workmanship and labor
• Specify the duration and coverage of each warranty in a summary document
Step 3: Gather Product Manuals and Instructions
• Gather product manuals and installation instructions for key roofing components
• Include safety guidelines and maintenance recommendations
Step 4: Organize Warranties and Manuals
• Organize all warranties and manuals into a client package
• Ensure that the package is clearly labeled and easy to navigate
Step 5: Review Warranty Information with Client
• Schedule a meeting or call with the client to review the warranties and manuals
• Explain coverage details and how to file a warranty claim if needed
Step 6: Provide Digital and Physical Copies to Client
• Provide the client with both digital and physical copies of all warranties and manuals
• Confirm receipt and ensure the client understands how to access and use the information
Step 7: Document Warranty Transfer (if applicable)
• Document the transfer of any transferable warranties to the client
• Obtain the client’s acknowledgment of the transfer in writing
Obtain final approvals and sign-offs from relevant authorities for roofing work
Step 1: Schedule Final Inspections with Authorities
• Contact relevant authorities to schedule final inspections of the roofing work
• Confirm the inspection date and time with all parties involved
Step 2: Prepare Required Documentation for Authorities
• Gather all required documentation for final approvals, including permits and inspection reports
• Ensure that all documents are complete and up-to-date
Step 3: Attend Final Inspections
• Attend final inspections with relevant authorities to address any questions or concerns
• Provide all requested documentation to the inspectors
Step 4: Address Any Issues Identified by Authorities
• If any issues are identified during the final inspection, develop a corrective action plan
• Assign tasks to the roofing crew or subcontractors as needed
Step 5: Obtain Final Sign-Offs and Approvals
• Obtain final sign-offs and approvals from all relevant authorities
• Ensure that the signed documents are filed in the project records
Step 6: Confirm Compliance with Local Regulations
• Confirm that all roofing work complies with local building codes and regulations
• Document any final compliance checks performed
Step 7: Notify Client of Final Approvals
• Notify the client that all final approvals have been obtained
• Provide copies of the approved documents for the client’s records
Remove all roofing equipment and clean up the site
Step 1: Develop a Demobilization Plan
• Create a plan for demobilizing the site, including the removal of equipment and materials
• Assign responsibilities for each aspect of the cleanup
Step 2: Gather and Inspect Roofing Equipment
• Gather all roofing equipment and tools from the site
• Inspect each item for damage or maintenance needs before transport
Step 3: Dismantle Temporary Structures and Safety Measures
• Dismantle any temporary structures, such as scaffolding, ladders, and barriers
• Ensure that all safety measures are removed safely and properly
Step 4: Remove Leftover Roofing Materials
• Remove all leftover roofing materials from the site
• Store reusable materials for future projects or arrange for disposal
Step 5: Conduct a Final Site Cleanup
• Conduct a thorough cleanup of the site to remove all debris and waste
• Confirm that all areas are cleared and safe for client use
Step 6: Inspect Site for Compliance with Cleanup Standards
• Inspect the site to ensure that it meets cleanup standards
• Address any issues or deficiencies identified during the inspection
Step 7: Document Completion of Site Cleanup
• Record the completion of the site cleanup in project documentation
• Take photographs of the cleaned site for client and project records
Perform a final safety check and remove all safety equipment
Step 1: Schedule Final Safety Check
• Set a specific date and time for conducting the final safety check
• Inform the project team of the scheduled safety check and responsibilities
Step 2: Conduct Visual Inspection of Safety Measures
• Walk through the site to inspect all safety measures, such as guardrails, harnesses, and warning signs
• Look for any remaining hazards or unsecured areas
Step 3: Test Safety Equipment Functionality
• Test all remaining safety equipment to ensure it is still in good working condition
• Verify that all safety locks, alarms, and systems are functioning correctly
Step 4: Remove Temporary Safety Measures
• Safely dismantle and remove all temporary safety measures, such as barriers, guardrails, and caution tape
• Confirm that the removal does not create new hazards
Step 5: Clean and Store Safety Equipment
• Clean all safety equipment used during the project
• Store the equipment in its designated location for future use
Step 6: Document Completion of Safety Check
• Record the completion of the final safety check in project documentation
• Take photographs of the cleared and secured site for records
Step 7: Confirm Safety Sign-Off with Project Manager
• Confirm with the project manager that all safety measures have been removed and the site is secure
• Obtain the project manager’s sign-off on the final safety check
Conduct a project debrief with the roofing team to review successes and areas for improvement
Step 1: Schedule a Project Debrief Meeting
• Schedule a meeting with the entire roofing team to conduct the project debrief
• Confirm the date, time, and location of the meeting with all team members
Step 2: Prepare a Debrief Agenda
• Create an agenda for the debrief, highlighting key topics such as successes, challenges, and areas for improvement
• Share the agenda with the team in advance
Step 3: Review Project Successes
• Discuss and acknowledge the key successes and accomplishments of the roofing team during the project
• Recognize team members who went above and beyond
Step 4: Identify Areas for Improvement
• Invite team members to share their perspectives on areas that could be improved
• Document specific suggestions and action items for future projects
Step 5: Discuss Challenges Faced During the Project
• Review any major challenges or issues faced by the roofing team
• Identify the root causes of these challenges and potential solutions
Step 6: Develop Action Plan for Future Projects
• Based on the feedback, develop an action plan to address the identified areas for improvement
• Assign responsibilities for implementing these improvements
Step 7: Document the Project Debrief
• Document the key takeaways from the debrief meeting, including successes, challenges, and the action plan
• Share the debrief summary with the entire team
Archive all project documents and records related to roofing work
Step 1: Gather All Project Documents
• Collect all project documents related to the roofing work, including inspection reports, punch lists, and client communications
• Ensure that all documents are complete and up-to-date
Step 2: Organize Digital and Physical Records
• Organize the project documents into digital and physical files
• Label all files clearly for easy reference in the future
Step 3: Verify Accuracy of Records
• Verify that all project records are accurate and free of errors
• Correct any discrepancies or incomplete information
Step 4: Backup Digital Records
• Create a secure digital backup of all project records
• Store the backup in a secure location with restricted access
Step 5: Archive Physical Copies of Key Documents
• Archive physical copies of essential documents, such as permits, inspection reports, and client sign-offs
• Store the physical copies in a secure, climate-controlled location
Step 6: Document Archiving Completion
• Record the completion of the archiving process in project documentation
• Take an inventory of all archived documents for reference
Step 7: Notify Project Team of Document Availability
• Inform the project team of the availability and location of archived documents
• Provide clear instructions on how to access digital and physical records if needed
Ensure all financials are settled and final invoices for roofing work are sent to the client
Step 1: Review Project Financials
• Review all financial records related to the roofing project, including purchase orders, subcontractor payments, and change orders
• Verify that all records are accurate and complete
Step 2: Confirm All Payments to Subcontractors
• Confirm that all payments to subcontractors have been processed and settled
• Obtain receipts or confirmations of payment for project records
Step 3: Verify Material and Equipment Costs
• Cross-check the costs of all materials and equipment used in the roofing project
• Confirm that all costs align with the project budget
Step 4: Prepare Final Invoice for Client
• Prepare a final invoice for the client, detailing all costs and charges related to the roofing work
• Include a breakdown of costs for transparency
Step 5: Obtain Approval for Final Invoice
• Submit the final invoice to the project manager or financial team for approval
• Confirm that all approvals are obtained before sending the invoice to the client
Step 6: Send Final Invoice to Client
• Send the final invoice to the client, along with any necessary supporting documentation
• Confirm receipt of the invoice with the client
Step 7: Document Financial Completion
• Record the completion of all financial transactions in the project records
• File copies of all invoices, receipts, and approvals for reference
Prepare and submit final invoice and closeout documents to the client
Step 1: Gather Closeout Documents
• Gather all closeout documents required for the roofing project, including warranties, maintenance manuals, and final inspection reports
• Ensure all documents are up-to-date and signed as needed
Step 2: Prepare Final Project Summary
• Create a final project summary for the client, detailing the scope of work, key milestones, and accomplishments
• Include a brief overview of project challenges and resolutions
Step 3: Organize Closeout Package for Client
• Organize the closeout documents and final project summary into a client package
• Ensure that all documents are clearly labeled and easy to navigate
Step 4: Schedule a Final Meeting with the Client
• Arrange a final meeting with the client to present the closeout package
• Confirm the date, time, and location with the client
Step 5: Present Closeout Package to Client
• Review the closeout package with the client during the final meeting
• Address any questions or concerns they may have about the documents
Step 6: Obtain Client Acknowledgment of Closeout
• Request the client’s acknowledgment of the closeout package and final invoice
• Obtain their signature or email confirmation for documentation
Step 7: Record Completion of Closeout Process
• Document the completion of the closeout process in project records
• File a copy of the signed closeout package for future reference
Construction SOPs Your Employees Will Actually Use!
Subtrak’s game-changing SOP software helps contractors effortlessly document their processes and automatically delegate tasks to their entire project team, making sure everyone knows exactly what to do and when.
Schedule a demo today to see how Subtrak can save you time, money, and headaches!
Download Our Free eBook
Get Blueprint for Success, our free guide to scaling and systemizing your specialty trade construction business.