Steep Slope Day Plan Checklist
Run a steep slope roofing day in short, controlled blocks so pace and quality stay high. Crews use lanes, defined roles, and scheduled resets to keep tear off, dry-in, and shingle production flowing. Notes included for mixed roofs where a low slope area must be sequenced around welding or adhesive cure times.
Mark lanes from eave to ridge and assign owners
Assign nailers, cutters, feeders, detail unit, ground
Strip the first zones and keep demo ahead by one lane
Dry in before starting shingle runs
Run two parallel lines and keep cutters feeding
Start the detail unit on priority details
Reset every 90 minutes and restage
Install vents and accessories as the field reaches them
Stage and install ridge
Start cleanup while the last lane finishes
Stage the first block for tomorrow