Welcome to the Construction Workflow SOP Template Library for Roof Restoration & Coating roofing projects. Access free, expertly crafted Standard Operating Procedures to guide your construction phase. Our templates cover every step, from initial setup to final application, ensuring efficient and high-quality workmanship. Download our templates today to streamline your construction process and achieve outstanding results.
Mobilize roofing crew and set up equipment on site
Step 1: Coordinate with Crew Members to Confirm Mobilization Plan
• Coordinate with crew members to confirm the mobilization plan, focusing on key tasks such as transporting equipment, setting up safety measures, and establishing work zones
• Verify that all team members are aware of their responsibilities and timelines
Step 2: Inspect Equipment and Materials Upon Arrival at the Site
• Inspect equipment and materials upon arrival at the site to confirm that all items are in good condition and aligned with the project plan
• Document any discrepancies or issues and address them promptly to prevent delays
Step 3: Set Up Equipment and Safety Measures in Designated Work Zones
• Set up equipment and safety measures in designated work zones, following the site safety plan and project guidelines
• Ensure that all safety barriers, signs, and protective measures are properly installed and clearly visible
Step 4: Brief the Roofing Crew on Key Tasks and Responsibilities
• Brief the roofing crew on key tasks and responsibilities, emphasizing critical safety measures and the importance of adhering to the project schedule
• Confirm that all team members are aligned on their roles and expectations
Step 5: Conduct a Safety Walkthrough to Confirm Compliance
• Conduct a safety walkthrough to confirm compliance with safety protocols, verifying that all equipment is properly secured and safety measures are in place
• Address any issues or concerns raised during the walkthrough
Step 6: Communicate Mobilization Status to Key Team Members and Stakeholders
• Communicate mobilization status to key team members and stakeholders, such as the project manager, site supervisor, and client representative, to confirm that the site is ready for construction work
Step 7: Document Mobilization Tasks and Inspections in Project Records
• Document mobilization tasks and inspections in project records and CRM, linking them to the project file for reference during ongoing work and follow-up checks
Conduct site safety briefing with roofing crew
Step 1: Prepare a Safety Briefing Agenda and Key Points
• Prepare a safety briefing agenda and key points based on the site safety plan, focusing on critical safety measures such as fall protection, PPE usage, and emergency procedures
• Confirm that all safety protocols align with company standards and local regulations
Step 2: Gather the Roofing Crew for a Briefing Session
• Gather the roofing crew for a briefing session at a designated location on-site, ensuring that all crew members are present and attentive
• Create a positive and focused atmosphere to encourage active participation
Step 3: Review Key Safety Protocols and Responsibilities
• Review key safety protocols and responsibilities with the roofing crew, emphasizing high-risk areas and specific tasks that require extra caution
• Use visual aids or demonstrations to reinforce critical safety measures
Step 4: Discuss Potential Hazards and Emergency Procedures
• Discuss potential hazards specific to the project site, such as working at heights, handling heavy materials, or weather-related risks
• Outline emergency procedures, including evacuation routes, first aid protocols, and reporting incidents
Step 5: Encourage Questions and Provide Clear Answers
• Encourage crew members to ask questions about the safety protocols or any concerns they may have about the site conditions
• Provide clear and concise answers, using examples or additional explanations if needed
Step 6: Reinforce the Importance of Adhering to Safety Measures
• Reinforce the importance of adhering to safety measures, emphasizing that everyone is responsible for maintaining a safe work environment
• Reiterate your commitment to crew safety and readiness to address any issues that arise
Step 7: Document the Safety Briefing and Key Discussions in Project Records
• Document the safety briefing and key discussions in project records and CRM, linking them to the project file for reference during site inspections and compliance checks
Coordinate with any subcontractors on site (if applicable)
Step 1: Identify Subcontractors and Their Responsibilities
• Identify the subcontractors involved in the project and outline their specific responsibilities based on the project scope, such as structural repairs, specialized coatings, or safety installations
• Ensure that all subcontractors are aware of their tasks and deliverables
Step 2: Establish a Communication Plan for On-Site Coordination
• Establish a communication plan for on-site coordination with subcontractors, specifying communication channels, reporting structures, and points of contact
• Ensure that all subcontractors are aligned on the preferred method of communication and the frequency of updates
Step 3: Conduct a Pre-Work Briefing with Subcontractors
• Conduct a pre-work briefing with subcontractors to review the project scope, safety protocols, and daily work plans
• Address any questions or concerns subcontractors may have and provide a clear timeline for task completion
Step 4: Monitor Subcontractor Activities to Ensure Compliance and Quality
• Monitor subcontractor activities on-site to ensure compliance with project specifications, safety protocols, and quality standards
• Address any deviations or issues promptly to avoid project delays or rework
Step 5: Coordinate Daily Check-Ins and Progress Updates with Subcontractors
• Coordinate daily check-ins and progress updates with subcontractors to confirm that all assigned tasks are being completed on schedule and to specification
• Use these updates to proactively address potential issues or resource needs
Step 6: Document Subcontractor Coordination and Key Discussions
• Document subcontractor coordination and key discussions in project records and CRM, linking them to the project file for reference during project tracking and follow-up actions
Step 7: Review Subcontractor Performance and Address Issues Immediately
• Review subcontractor performance regularly to identify any areas for improvement or additional support required
• Address any issues immediately to maintain project quality and safety standards
Verify delivery and inventory of restoration/coating materials
Step 1: Confirm Material Orders and Delivery Schedules
• Confirm material orders and delivery schedules with suppliers, ensuring that all restoration and coating materials are scheduled to arrive on time based on the project timeline
• Communicate expected delivery dates to key team members and prepare for material receipt
Step 2: Inspect Delivered Materials for Quality and Completeness
• Inspect delivered materials upon arrival at the project site, checking for quality, quantity, and compliance with project specifications
• Look for visible defects, incorrect items, or missing materials and address any discrepancies promptly
Step 3: Update Inventory Records and Material Checklists
• Update inventory records and material checklists to reflect the materials received, noting quantities, descriptions, and any specific storage or handling instructions
• Link inventory records to the project file for easy tracking and auditing
Step 4: Store Materials in Designated Areas According to Safety Guidelines
• Store materials in designated areas on-site according to safety guidelines, ensuring that all items are properly labeled, organized, and protected from environmental conditions or unauthorized access
• Verify that all storage areas are secure and compliant with safety protocols
Step 5: Coordinate with Team Members to Distribute Materials as Needed
• Coordinate with team members, such as the site supervisor or crew leads, to distribute materials as needed for ongoing tasks
• Confirm that all materials are allocated according to the project plan and daily work schedules
Step 6: Communicate Delivery Status and Inventory Updates to Key Team Members
• Communicate delivery status and inventory updates to key team members, such as the project manager, site supervisor, and procurement officer
• Confirm that everyone is aware of the materials available and any potential shortages or issues
Step 7: Document Material Delivery and Inventory Checks in Project Records
• Document material delivery and inventory checks in project records and CRM, linking them to the project file for reference during ongoing work and follow-up audits
Prepare roof surface for restoration/coating (e.g., clean, inspect)
Step 1: Inspect the Roof Surface for Damage or Contaminants
• Inspect the roof surface for damage or contaminants, focusing on areas such as seams, flashing, and penetrations
• Identify any debris, mold, or structural issues that need to be addressed before applying coatings
Step 2: Remove Debris and Clean the Roof Surface Thoroughly
• Remove debris and clean the roof surface thoroughly, using appropriate tools and cleaning solutions to ensure a smooth and contaminant-free surface
• Pay special attention to removing dust, oil, and old coating residues
Step 3: Repair Minor Damage to Ensure a Smooth and Even Surface
• Repair minor damage, such as cracks, holes, or loose seams, to ensure a smooth and even surface for the restoration or coating application
• Use recommended patching materials and techniques for each specific type of roof
Step 4: Conduct a Moisture Test to Confirm Surface Readiness (if applicable)
• Conduct a moisture test to confirm surface readiness, using a moisture meter or similar tool to identify areas of trapped moisture or leaks
• Address any areas with elevated moisture levels before proceeding with coatings
Step 5: Prime Key Areas That Require Additional Adhesion (if applicable)
• Prime key areas that require additional adhesion, such as edges, penetrations, and high-traffic zones, to improve coating performance and longevity
• Use recommended primers and follow manufacturer guidelines for application
Step 6: Verify that the Roof Surface is Clean, Dry, and Ready for Coating
• Verify that the roof surface is clean, dry, and ready for coating, conducting a final visual inspection to confirm that all preparation tasks are complete
• Document any remaining concerns or areas that need further attention
Step 7: Document Roof Preparation Tasks in Project Records and CRM
• Document roof preparation tasks in project records and CRM, linking them to the project file for reference during ongoing work and quality control checks
Perform necessary repairs to the existing roof
Step 1: Identify and Prioritize Repair Areas Based on Inspection Findings
• Identify and prioritize repair areas based on inspection findings, focusing on critical issues such as structural weaknesses, leaks, or deteriorated materials
• Confirm that all identified issues align with the project plan and client expectations
Step 2: Gather the Necessary Materials and Tools for Repairs
• Gather the necessary materials and tools for repairs, ensuring that everything is readily accessible and organized for efficient task completion
• Verify that all materials meet project specifications and are compatible with the existing roof system
Step 3: Perform Repairs According to Best Practices and Manufacturer Guidelines
• Perform repairs according to best practices and manufacturer guidelines, using appropriate techniques for each type of damage or material
• Pay close attention to ensuring proper sealing, fastening, and alignment to maintain roof integrity
Step 4: Inspect and Test Repairs for Quality and Durability
• Inspect and test repairs for quality and durability, checking for proper adhesion, alignment, and water resistance
• Use tools such as infrared cameras, moisture meters, or visual inspections to confirm that all repairs meet standards
Step 5: Document Completed Repairs with Photos and Notes
• Document completed repairs with photos and notes, capturing key details such as repair locations, materials used, and techniques applied
• Organize photos and notes for easy reference during quality checks and client updates
Step 6: Communicate Repair Status to Key Team Members and Stakeholders
• Communicate repair status to key team members and stakeholders, such as the project manager, site supervisor, and client representative
• Confirm that all parties are aware of the completed repairs and any remaining concerns
Step 7: Save Repair Records in Project Files and CRM
• Save repair records in project files and CRM, linking them to the project file for reference during quality control checks and client meetings
Apply primer and base coat as required
Step 1: Select and Prepare the Appropriate Primer and Base Coat Materials
• Select and prepare the appropriate primer and base coat materials based on the project specifications and manufacturer recommendations
• Verify that all materials are in good condition and compatible with the existing roof system
Step 2: Set Up and Calibrate Application Equipment
• Set up and calibrate application equipment, such as sprayers or rollers, according to manufacturer guidelines and project requirements
• Conduct a test application on a small area to confirm that equipment is functioning correctly
Step 3: Apply Primer to Key Areas as Specified in Project Plan
• Apply primer to key areas as specified in the project plan, focusing on edges, penetrations, and areas with previous damage or repairs
• Follow recommended application techniques and drying times to ensure proper adhesion
Step 4: Inspect Primer Application for Coverage and Consistency
• Inspect the primer application for coverage and consistency, checking for any missed spots, pooling, or uneven layers
• Make adjustments or reapply primer as needed to achieve a uniform base
Step 5: Apply Base Coat in a Controlled and Even Manner
• Apply the base coat in a controlled and even manner, using the recommended techniques for the specific coating type (e.g., spray, roll, or brush)
• Maintain a consistent thickness and coverage to ensure durability and protection
Step 6: Allow the Base Coat to Dry and Cure According to Manufacturer Guidelines
• Allow the base coat to dry and cure according to manufacturer guidelines, avoiding foot traffic or additional work on the coated areas until fully set
• Monitor environmental conditions to ensure optimal curing
Step 7: Document Primer and Base Coat Application in Project Records
• Document the primer and base coat application in project records and CRM, linking them to the project file for reference during ongoing work and follow-up inspections
Apply roof coating material according to manufacturer specifications
Step 1: Review Manufacturer Specifications for the Coating Material
• Review manufacturer specifications for the coating material, focusing on key details such as recommended application techniques, drying times, and environmental conditions
• Ensure that all team members involved in the application are aware of the guidelines
Step 2: Set Up Application Equipment and Confirm Calibration
• Set up application equipment such as sprayers or rollers and confirm that it is calibrated according to the manufacturer’s specifications
• Conduct a test application on a small area to verify that equipment is functioning properly
Step 3: Apply Roof Coating Material in Even and Controlled Layers
• Apply the roof coating material in even and controlled layers, maintaining a consistent thickness and coverage as specified by the manufacturer
• Follow recommended techniques for edges, seams, and areas with previous damage or repairs
Step 4: Monitor Environmental Conditions During Application
• Monitor environmental conditions such as temperature, humidity, and wind speed during the application, adjusting work schedules as needed to maintain optimal conditions
• Pause or delay application if conditions exceed the manufacturer’s specified limits
Step 5: Inspect the Applied Coating for Uniformity and Adherence
• Inspect the applied coating for uniformity and adherence, checking for any missed spots, pooling, or signs of improper adhesion
• Address any issues immediately to prevent further complications
Step 6: Allow the Coating to Dry and Cure According to Guidelines
• Allow the coating to dry and cure according to the manufacturer’s guidelines, avoiding foot traffic or additional work on the coated areas until fully set
• Monitor the curing process and document any deviations from the recommended conditions
Step 7: Document Coating Application in Project Records and CRM
• Document the coating application in project records and CRM, linking it to the project file for reference during ongoing work and follow-up inspections
Install flashing and ensure all penetrations are sealed
Step 1: Review the Project Plan for Flashing Installation Requirements
• Review the project plan for flashing installation requirements, focusing on areas such as roof edges, valleys, and penetrations
• Confirm that the specified flashing materials and installation methods align with manufacturer guidelines and industry standards
Step 2: Prepare the Roof Surface and Flashing Materials
• Prepare the roof surface and flashing materials, ensuring that all contact areas are clean, dry, and free from debris or obstructions
• Cut flashing materials to the required sizes and shapes for each designated area
Step 3: Install Flashing in Key Areas According to Best Practices
• Install flashing in key areas according to best practices, securing it with the appropriate fasteners and sealants to prevent water intrusion
• Pay special attention to overlaps, corners, and junctions to ensure a watertight seal
Step 4: Inspect and Test Flashing for Proper Sealing and Stability
• Inspect and test the installed flashing for proper sealing and stability, checking for gaps, loose fasteners, or signs of improper adhesion
• Reapply sealant or adjust flashing as needed to maintain a watertight barrier
Step 5: Seal All Roof Penetrations with Compatible Materials
• Seal all roof penetrations with compatible materials, focusing on areas such as vents, chimneys, and skylights
• Use manufacturer-recommended sealants and techniques to ensure long-lasting protection
Step 6: Document Flashing and Sealing Tasks in Project Records
• Document flashing and sealing tasks in project records and CRM, including photos and notes of key installations and any areas that required special attention
• Link all information to the project file for reference during quality checks and client updates
Step 7: Communicate Flashing Installation Status to Key Team Members
• Communicate flashing installation status to key team members, such as the project manager and site supervisor, to confirm that all tasks have been completed to specification
Conduct weekly quality control inspections
Step 1: Review Project Scope and Key Quality Standards
• Review the project scope and key quality standards to identify critical areas that need to be inspected, such as coating application, flashing installations, and overall roof integrity
• Confirm that all inspection criteria align with client expectations and industry regulations
Step 2: Schedule Weekly Quality Control Inspections with the Project Team
• Schedule weekly quality control inspections with the project team, coordinating with key personnel such as the site supervisor, quality control officer, and safety officer
• Confirm inspection dates and times with all relevant team members
Step 3: Inspect Key Areas for Compliance with Quality Standards
• Inspect key areas for compliance with quality standards, focusing on critical elements such as coating thickness, adhesion, flashing installations, and water drainage
• Use inspection tools such as calipers, moisture meters, and visual checklists to verify quality
Step 4: Document Inspection Findings with Photos and Notes
• Document inspection findings with photos and detailed notes, capturing any issues, defects, or areas that need further attention
• Include measurements, observations, and recommendations for corrective actions if needed
Step 5: Communicate Inspection Results and Assign Corrective Actions
• Communicate inspection results to the project manager and site supervisor, assigning corrective actions to address any identified issues promptly
• Confirm that all assigned personnel are aware of their responsibilities and deadlines for completing corrective tasks
Step 6: Follow Up on Corrective Actions and Verify Completion
• Follow up on corrective actions during the next inspection cycle to verify that all identified issues have been resolved according to quality standards
• Document the completion of corrective actions and update inspection records
Step 7: Save Quality Control Inspection Reports in Project Records and CRM
• Save quality control inspection reports in project records and CRM, linking them to the project file for reference during follow-up inspections and client updates
Perform site cleanup and waste disposal of restoration/coating materials
Step 1: Review Site Cleanup Requirements Based on the Project Scope
• Review site cleanup requirements based on the project scope, focusing on key areas such as coating waste, debris from flashing installations, and leftover materials
• Confirm that all cleanup tasks align with safety and environmental regulations
Step 2: Gather and Organize Waste Disposal Equipment and Supplies
• Gather and organize waste disposal equipment and supplies, such as dumpsters, trash bags, and cleaning tools
• Confirm that all waste containers are properly labeled and positioned according to safety guidelines
Step 3: Remove Debris and Hazardous Materials from the Site
• Remove debris and hazardous materials from the site, following safety protocols for handling and disposing of chemicals, coatings, and sharp objects
• Use appropriate PPE and follow disposal guidelines to prevent contamination or injuries
Step 4: Clean Work Areas and Restore Site Conditions
• Clean work areas and restore site conditions, focusing on tasks such as sweeping, washing, and organizing leftover materials or equipment
• Confirm that all tools and supplies are properly stored and that the site is free from obstructions or hazards
Step 5: Dispose of Waste According to Environmental Regulations
• Dispose of waste according to environmental regulations, arranging for the removal of dumpsters or the transport of hazardous materials to designated facilities
• Verify that all disposal receipts and documentation are collected for record-keeping
Step 6: Conduct a Final Walkthrough to Confirm Site Cleanup
• Conduct a final walkthrough to confirm that all cleanup tasks have been completed and that the site is safe and presentable for client inspection or handover
• Document any remaining tasks or issues for follow-up actions
Step 7: Document Site Cleanup Tasks and Disposal Records in CRM
• Document site cleanup tasks and disposal records in CRM, linking them to the project file for reference during final inspections and client meetings
Conduct final inspection of the roofing work
Step 1: Prepare a Final Inspection Checklist and Key Criteria
• Prepare a final inspection checklist and key criteria based on the project scope, focusing on critical elements such as coating application, flashing integrity, and overall roof performance
• Confirm that all criteria align with client expectations and industry standards
Step 2: Invite Key Team Members to the Final Inspection
• Invite key team members to the final inspection, such as the project manager, site supervisor, quality control officer, and client representative
• Confirm the inspection date, time, and scope with all participants
Step 3: Inspect the Roof for Compliance with Project Specifications
• Inspect the roof for compliance with project specifications, focusing on areas such as coating thickness, waterproofing, flashing installations, and drainage
• Use inspection tools and techniques to verify that all work meets quality standards
Step 4: Identify and Document Any Remaining Issues or Concerns
• Identify and document any remaining issues or concerns, such as minor defects, missed spots, or inconsistencies in the application
• Include photos and detailed notes to clarify the nature and location of each issue
Step 5: Communicate Findings and Next Steps with Key Team Members
• Communicate findings and next steps with key team members, assigning tasks to address any identified issues or prepare for final client walkthroughs
• Confirm that all assigned personnel are aware of their responsibilities and deadlines
Step 6: Schedule a Follow-Up Inspection (if needed)
• Schedule a follow-up inspection if needed to verify that all corrective actions have been completed and that the roof is ready for client handover
• Confirm the follow-up date and time with key personnel
Step 7: Document the Final Inspection and Results in Project Records and CRM
• Document the final inspection and results in project records and CRM, linking them to the project file for reference during client meetings and project closure
Notify client that roofing work is substantially complete
Step 1: Prepare a Summary of Completed Work and Key Highlights
• Prepare a summary of completed work and key highlights, focusing on major tasks accomplished, materials used, and quality standards achieved
• Ensure that all project milestones and key deliverables are documented clearly for the client’s reference
Step 2: Draft a Formal Completion Notification for the Client
• Draft a formal completion notification for the client, using clear and concise language to communicate that the roofing work is substantially complete
• Include any relevant information such as next steps for inspections, final walkthroughs, and outstanding items
Step 3: Send the Completion Notification to the Client
• Send the completion notification to the client via their preferred communication method, such as email, letter, or client portal
• Include a contact point for any immediate questions or clarifications the client may have
Step 4: Invite the Client to Schedule a Final Walkthrough and Inspection
• Invite the client to schedule a final walkthrough and inspection, proposing multiple dates and times for their convenience
• Confirm the client’s preferred date and time for the walkthrough and note it in project records
Step 5: Confirm Receipt of the Notification with the Client
• Follow up to confirm the client’s receipt of the completion notification and answer any immediate questions they may have
• Reiterate your commitment to addressing any remaining concerns or punch list items
Step 6: Log the Notification and Client Communication in CRM
• Log the notification and client communication in CRM, linking them to the project file for reference during final inspections and handover
Step 7: Document Substantial Completion Status in Project Records
• Document substantial completion status in project records, noting key dates and any outstanding tasks that remain to be addressed
Construction SOPs Your Employees Will Actually Use!
Subtrak’s game-changing SOP software helps contractors effortlessly document their processes and automatically delegate tasks to their entire project team, making sure everyone knows exactly what to do and when.
Schedule a demo today to see how Subtrak can save you time, money, and headaches!
Download Our Free eBook
Get Blueprint for Success, our free guide to scaling and systemizing your specialty trade construction business.