Construction Workflow
Welcome to the Construction Workflow SOP Template Library for Roof Restoration & Coating roofing projects. Access free, expertly crafted Standard Operating Procedures to guide your construction phase. Our templates cover every step, from initial setup to final application, ensuring efficient and high-quality workmanship. Download our templates today to streamline your construction process and achieve outstanding results.
Mobilize roofing crew and set up equipment on site
Step 1: Notify Roofing Crew
- Inform all roofing crew members of the mobilization schedule
- Confirm the date time and location for assembling at the project site
Step 2: Transport Equipment to Site
- Arrange transportation for all necessary roofing equipment and tools
- Ensure all equipment is securely loaded and transported safely to the site
Step 3: Conduct Site Orientation
- Upon arrival conduct a brief site orientation with the crew
- Review the site layout access points and designated areas for equipment storage
Step 4: Set Up Equipment Storage Area
- Designate a secure area for storing roofing equipment and materials
- Ensure the area is organized and easily accessible for the crew
Step 5: Inspect Equipment
- Check all roofing equipment and tools to ensure they are in good working condition
- Perform any necessary maintenance or repairs before use
Step 6: Assemble Roofing Equipment
- Set up all required roofing equipment such as ladders scaffolding and safety barriers
- Ensure equipment is positioned correctly and securely
Step 7: Install Safety Measures
- Set up fall protection systems including guardrails harnesses and safety nets
- Ensure all safety measures comply with OSHA regulations and site-specific safety plans
Step 8: Verify Utility Connections
- Confirm that all necessary utility connections such as electricity for power tools are available and functioning
- Set up temporary utilities if needed
Step 9: Distribute PPE
- Ensure all crew members have the required personal protective equipment (PPE)
- Verify that PPE is in good condition and fits properly
Step 10: Conduct Final Check
- Perform a final check to ensure all equipment is set up correctly and safely
- Confirm that the crew is ready to begin work according to the project schedule
Conduct site safety briefing with roofing crew
Step 1: Prepare Safety Materials
- Gather all necessary safety materials including safety plans PPE and emergency procedures
- Prepare a list of key safety points to cover during the briefing
Step 2: Assemble Roofing Crew
- Gather the roofing crew at a designated meeting area on the site
- Ensure everyone is present and paying attention
Step 3: Review Safety Plans
- Discuss the site-specific safety plan including fall protection electrical safety and material handling
- Highlight any unique hazards or challenges specific to the project site
Step 4: Distribute PPE
- Ensure all crew members have the required PPE such as helmets harnesses gloves and safety glasses
- Review the proper use and maintenance of PPE
Step 5: Explain Emergency Procedures
- Detail the emergency procedures including the location of first aid kits emergency exits and contact information for emergency services
- Ensure everyone knows what to do in case of an accident or emergency
Step 6: Outline Safe Work Practices
- Discuss safe work practices for roofing tasks such as proper ladder usage safe lifting techniques and maintaining a clean work area
- Emphasize the importance of reporting unsafe conditions or near-miss incidents
Step 7: Assign Safety Roles
- Designate safety roles and responsibilities to specific crew members such as safety monitors or first aid responders
- Ensure everyone understands their roles and responsibilities
Step 8: Encourage Questions and Feedback
- Invite crew members to ask questions or provide feedback on the safety plan
- Address any concerns or suggestions to improve site safety
Step 9: Document the Briefing
- Record the details of the safety briefing including the date attendees and topics covered
- Keep a copy of the documentation for your records and compliance purposes
Coordinate with any subcontractors on site (if applicable)
Step 1: Identify Subcontractors Present on Site
- Review the schedule to identify which subcontractors are working on site
- Confirm their presence and scope of work for the day
Step 2: Establish Point of Contact
- Assign a designated crew member to act as the point of contact for subcontractor coordination
- Share contact details with the subcontractors
Step 3: Hold a Coordination Meeting
- Meet with subcontractors to discuss their work schedule and any dependencies
- Address any potential overlaps or conflicts in work areas
Step 4: Review Safety and Site Access Rules
- Reiterate site safety rules and access protocols with the subcontractors
- Confirm that subcontractors are using the correct PPE
Step 5: Confirm Communication Channels
- Establish the primary communication channels for the day (e.g., radios or cell phones)
- Ensure all subcontractors know who to contact for issues
Step 6: Document Daily Coordination Details
- Document key details from the coordination meeting, including work schedules and contact information
- Share documentation with relevant crew members
Step 7: Monitor Subcontractor Activities
- Monitor the activities of subcontractors to ensure compliance with project plans
- Address any issues or conflicts promptly
Verify delivery and inventory of restoration/coating materials
Step 1: Confirm Material Orders and Delivery Schedules
- Confirm material orders and delivery schedules with suppliers, ensuring that all restoration and coating materials are scheduled to arrive on time based on the project timeline
- Communicate expected delivery dates to key team members and prepare for material receipt
Step 2: Inspect Delivered Materials for Quality and Completeness
- Inspect delivered materials upon arrival at the project site, checking for quality, quantity, and compliance with project specifications
- Look for visible defects, incorrect items, or missing materials and address any discrepancies promptly
Step 3: Update Inventory Records and Material Checklists
- Update inventory records and material checklists to reflect the materials received, noting quantities, descriptions, and any specific storage or handling instructions
- Link inventory records to the project file for easy tracking and auditing
Step 4: Store Materials in Designated Areas According to Safety Guidelines
- Store materials in designated areas on-site according to safety guidelines, ensuring that all items are properly labeled, organized, and protected from environmental conditions or unauthorized access
- Verify that all storage areas are secure and compliant with safety protocols
Step 5: Coordinate with Team Members to Distribute Materials as Needed
- Coordinate with team members, such as the site supervisor or crew leads, to distribute materials as needed for ongoing tasks
- Confirm that all materials are allocated according to the project plan and daily work schedules
Step 6: Communicate Delivery Status and Inventory Updates to Key Team Members
- Communicate delivery status and inventory updates to key team members, such as the project manager, site supervisor, and procurement officer
- Confirm that everyone is aware of the materials available and any potential shortages or issues
Step 7: Document Material Delivery and Inventory Checks in Project Records
- Document material delivery and inventory checks in project records and CRM, linking them to the project file for reference during ongoing work and follow-up audits
Prepare roof surface for restoration/coating (e.g., clean, inspect)
Step 1: Inspect the Roof Surface for Damage or Contaminants
- Inspect the roof surface for damage or contaminants, focusing on areas such as seams, flashing, and penetrations
- Identify any debris, mold, or structural issues that need to be addressed before applying coatings
Step 2: Remove Debris and Clean the Roof Surface Thoroughly
- Remove debris and clean the roof surface thoroughly, using appropriate tools and cleaning solutions to ensure a smooth and contaminant-free surface
- Pay special attention to removing dust, oil, and old coating residues
Step 3: Repair Minor Damage to Ensure a Smooth and Even Surface
- Repair minor damage, such as cracks, holes, or loose seams, to ensure a smooth and even surface for the restoration or coating application
- Use recommended patching materials and techniques for each specific type of roof
Step 4: Conduct a Moisture Test to Confirm Surface Readiness (if applicable)
- Conduct a moisture test to confirm surface readiness, using a moisture meter or similar tool to identify areas of trapped moisture or leaks
- Address any areas with elevated moisture levels before proceeding with coatings
Step 5: Prime Key Areas That Require Additional Adhesion (if applicable)
- Prime key areas that require additional adhesion, such as edges, penetrations, and high-traffic zones, to improve coating performance and longevity
- Use recommended primers and follow manufacturer guidelines for application
Step 6: Verify that the Roof Surface is Clean, Dry, and Ready for Coating
- Verify that the roof surface is clean, dry, and ready for coating, conducting a final visual inspection to confirm that all preparation tasks are complete
- Document any remaining concerns or areas that need further attention
Step 7: Document Roof Preparation Tasks in Project Records and CRM
- Document roof preparation tasks in project records and CRM, linking them to the project file for reference during ongoing work and quality control checks
Perform necessary repairs to the existing roof
Step 1: Identify and Prioritize Repair Areas Based on Inspection Findings
- Identify and prioritize repair areas based on inspection findings, focusing on critical issues such as structural weaknesses, leaks, or deteriorated materials
- Confirm that all identified issues align with the project plan and client expectations
Step 2: Gather the Necessary Materials and Tools for Repairs
- Gather the necessary materials and tools for repairs, ensuring that everything is readily accessible and organized for efficient task completion
- Verify that all materials meet project specifications and are compatible with the existing roof system
Step 3: Perform Repairs According to Best Practices and Manufacturer Guidelines
- Perform repairs according to best practices and manufacturer guidelines, using appropriate techniques for each type of damage or material
- Pay close attention to ensuring proper sealing, fastening, and alignment to maintain roof integrity
Step 4: Inspect and Test Repairs for Quality and Durability
- Inspect and test repairs for quality and durability, checking for proper adhesion, alignment, and water resistance
- Use tools such as infrared cameras, moisture meters, or visual inspections to confirm that all repairs meet standards
Step 5: Document Completed Repairs with Photos and Notes
- Document completed repairs with photos and notes, capturing key details such as repair locations, materials used, and techniques applied
- Organize photos and notes for easy reference during quality checks and client updates
Step 6: Communicate Repair Status to Key Team Members and Stakeholders
- Communicate repair status to key team members and stakeholders, such as the project manager, site supervisor, and client representative
- Confirm that all parties are aware of the completed repairs and any remaining concerns
Step 7: Save Repair Records in Project Files and CRM
- Save repair records in project files and CRM, linking them to the project file for reference during quality control checks and client meetings
Apply primer and base coat as required
Step 1: Select and Prepare the Appropriate Primer and Base Coat Materials
- Select and prepare the appropriate primer and base coat materials based on the project specifications and manufacturer recommendations
- Verify that all materials are in good condition and compatible with the existing roof system
Step 2: Set Up and Calibrate Application Equipment
- Set up and calibrate application equipment, such as sprayers or rollers, according to manufacturer guidelines and project requirements
- Conduct a test application on a small area to confirm that equipment is functioning correctly
Step 3: Apply Primer to Key Areas as Specified in Project Plan
- Apply primer to key areas as specified in the project plan, focusing on edges, penetrations, and areas with previous damage or repairs
- Follow recommended application techniques and drying times to ensure proper adhesion
Step 4: Inspect Primer Application for Coverage and Consistency
- Inspect the primer application for coverage and consistency, checking for any missed spots, pooling, or uneven layers
- Make adjustments or reapply primer as needed to achieve a uniform base
Step 5: Apply Base Coat in a Controlled and Even Manner
- Apply the base coat in a controlled and even manner, using the recommended techniques for the specific coating type (e.g., spray, roll, or brush)
- Maintain a consistent thickness and coverage to ensure durability and protection
Step 6: Allow the Base Coat to Dry and Cure According to Manufacturer Guidelines
- Allow the base coat to dry and cure according to manufacturer guidelines, avoiding foot traffic or additional work on the coated areas until fully set
- Monitor environmental conditions to ensure optimal curing
Step 7: Document Primer and Base Coat Application in Project Records
- Document the primer and base coat application in project records and CRM, linking them to the project file for reference during ongoing work and follow-up inspections
Apply roof coating material according to manufacturer specifications
Step 1: Review Manufacturer Specifications for the Coating Material
- Review manufacturer specifications for the coating material, focusing on key details such as recommended application techniques, drying times, and environmental conditions
- Ensure that all team members involved in the application are aware of the guidelines
Step 2: Set Up Application Equipment and Confirm Calibration
- Set up application equipment such as sprayers or rollers and confirm that it is calibrated according to the manufacturers specifications
- Conduct a test application on a small area to verify that equipment is functioning properly
Step 3: Apply Roof Coating Material in Even and Controlled Layers
- Apply the roof coating material in even and controlled layers, maintaining a consistent thickness and coverage as specified by the manufacturer
- Follow recommended techniques for edges, seams, and areas with previous damage or repairs
Step 4: Monitor Environmental Conditions During Application
- Monitor environmental conditions such as temperature, humidity, and wind speed during the application, adjusting work schedules as needed to maintain optimal conditions
- Pause or delay application if conditions exceed the manufacturers specified limits
Step 5: Inspect the Applied Coating for Uniformity and Adherence
- Inspect the applied coating for uniformity and adherence, checking for any missed spots, pooling, or signs of improper adhesion
- Address any issues immediately to prevent further complications
Step 6: Allow the Coating to Dry and Cure According to Guidelines
- Allow the coating to dry and cure according to the manufacturers guidelines, avoiding foot traffic or additional work on the coated areas until fully set
- Monitor the curing process and document any deviations from the recommended conditions
Step 7: Document Coating Application in Project Records and CRM
- Document the coating application in project records and CRM, linking it to the project file for reference during ongoing work and follow-up inspections
Install flashing and ensure all penetrations are sealed
Step 1: Review the Project Plan for Flashing Installation Requirements
- Review the project plan for flashing installation requirements, focusing on areas such as roof edges, valleys, and penetrations
- Confirm that the specified flashing materials and installation methods align with manufacturer guidelines and industry standards
Step 2: Prepare the Roof Surface and Flashing Materials
- Prepare the roof surface and flashing materials, ensuring that all contact areas are clean, dry, and free from debris or obstructions
- Cut flashing materials to the required sizes and shapes for each designated area
Step 3: Install Flashing in Key Areas According to Best Practices
- Install flashing in key areas according to best practices, securing it with the appropriate fasteners and sealants to prevent water intrusion
- Pay special attention to overlaps, corners, and junctions to ensure a watertight seal
Step 4: Inspect and Test Flashing for Proper Sealing and Stability
- Inspect and test the installed flashing for proper sealing and stability, checking for gaps, loose fasteners, or signs of improper adhesion
- Reapply sealant or adjust flashing as needed to maintain a watertight barrier
Step 5: Seal All Roof Penetrations with Compatible Materials
- Seal all roof penetrations with compatible materials, focusing on areas such as vents, chimneys, and skylights
- Use manufacturer-recommended sealants and techniques to ensure long-lasting protection
Step 6: Document Flashing and Sealing Tasks in Project Records
- Document flashing and sealing tasks in project records and CRM, including photos and notes of key installations and any areas that required special attention
- Link all information to the project file for reference during quality checks and client updates
Step 7: Communicate Flashing Installation Status to Key Team Members
- Communicate flashing installation status to key team members, such as the project manager and site supervisor, to confirm that all tasks have been completed to specification
Conduct weekly quality control inspections
Step 1: Schedule Inspections
- Set a regular schedule for weekly quality control inspections throughout the duration of the roofing project
- Inform the roofing crew and relevant stakeholders of the inspection schedule
Step 2: Prepare Inspection Checklist
- Create a comprehensive inspection checklist covering all critical aspects of the roofing work
- Include items such as material quality installation techniques safety compliance and site cleanliness
Step 3: Gather Necessary Tools
- Collect all tools and equipment needed for the inspection such as a camera measuring tape notepad and PPE
- Ensure you have access to the project plans and specifications for reference
Step 4: Conduct Visual Inspection
- Perform a thorough visual inspection of the roofing work
- Look for visible defects such as misaligned shingles gaps in flashing and improperly secured materials
Step 5: Check Installation Quality
- Verify that the roofing materials are installed according to manufacturer guidelines and project specifications
- Ensure proper overlaps fastening and integration with roof penetrations
Step 6: Assess Safety Compliance
- Ensure that all safety measures such as fall protection systems and PPE usage are being followed
- Check for any potential hazards or unsafe practices on the site
Step 7: Evaluate Site Cleanliness
- Inspect the site for cleanliness and organization
- Ensure that debris is being regularly removed and materials are stored safely and securely
Step 8: Document Findings
- Record detailed notes and take photographs of any issues or areas of concern
- Use the inspection checklist to ensure all aspects of the roofing work are covered
Step 9: Communicate with Crew
- Discuss the inspection findings with the roofing crew and address any issues immediately
- Provide guidance and corrective actions to ensure quality standards are met
Step 10: Follow Up on Corrections
- Monitor the progress of corrective actions and verify that issues identified during the inspection are resolved
- Schedule additional inspections if needed to ensure continuous quality control
Perform site cleanup and waste disposal of restoration/coating materials
Step 1: Review Site Cleanup Requirements Based on the Project Scope
- Review site cleanup requirements based on the project scope, focusing on key areas such as coating waste, debris from flashing installations, and leftover materials
- Confirm that all cleanup tasks align with safety and environmental regulations
Step 2: Gather and Organize Waste Disposal Equipment and Supplies
- Gather and organize waste disposal equipment and supplies, such as dumpsters, trash bags, and cleaning tools
- Confirm that all waste containers are properly labeled and positioned according to safety guidelines
Step 3: Remove Debris and Hazardous Materials from the Site
- Remove debris and hazardous materials from the site, following safety protocols for handling and disposing of chemicals, coatings, and sharp objects
- Use appropriate PPE and follow disposal guidelines to prevent contamination or injuries
Step 4: Clean Work Areas and Restore Site Conditions
- Clean work areas and restore site conditions, focusing on tasks such as sweeping, washing, and organizing leftover materials or equipment
- Confirm that all tools and supplies are properly stored and that the site is free from obstructions or hazards
Step 5: Dispose of Waste According to Environmental Regulations
- Dispose of waste according to environmental regulations, arranging for the removal of dumpsters or the transport of hazardous materials to designated facilities
- Verify that all disposal receipts and documentation are collected for record-keeping
Step 6: Conduct a Final Walkthrough to Confirm Site Cleanup
- Conduct a final walkthrough to confirm that all cleanup tasks have been completed and that the site is safe and presentable for client inspection or handover
- Document any remaining tasks or issues for follow-up actions
Step 7: Document Site Cleanup Tasks and Disposal Records in CRM
- Document site cleanup tasks and disposal records in CRM, linking them to the project file for reference during final inspections and client meetings
Conduct final inspection of the roofing work
Step 1: Schedule Final Inspection
- Coordinate with the project manager roofing crew and relevant stakeholders to schedule the final inspection
- Confirm the date and time ensuring all necessary participants are informed
Step 2: Prepare Inspection Checklist
- Create a comprehensive checklist for the final inspection covering all critical aspects of the roofing work
- Include items such as material quality installation techniques flashing and roof penetrations
Step 3: Gather Necessary Tools
- Collect all tools and equipment needed for the inspection such as a camera measuring tape notepad and PPE
- Ensure you have access to the project plans specifications and previous inspection reports for reference
Step 4: Perform Visual Inspection
- Conduct a thorough visual inspection of the entire roof
- Check for any visible defects such as misaligned shingles gaps in flashing and improperly secured materials
Step 5: Verify Installation Quality
- Ensure that all roofing materials are installed according to manufacturer guidelines and project specifications
- Check for proper overlaps fastening and integration with roof penetrations
Step 6: Inspect Flashing and Penetrations
- Examine flashing around chimneys vents skylights and other roof penetrations
- Ensure flashing is properly installed and sealed to prevent water infiltration
Step 7: Check for Uniformity
- Verify that the roofing materials are uniform in appearance and correctly aligned
- Ensure that there are no color mismatches uneven surfaces or aesthetic issues
Step 8: Test for Leaks
- Perform a water test if applicable to check for leaks
- Simulate rain conditions and inspect the interior of the building for any signs of water infiltration
Step 9: Document Findings
- Record detailed notes and take photographs of any issues or areas of concern
- Use the inspection checklist to ensure all aspects of the roofing work are covered
Step 10: Communicate with Crew
- Discuss the inspection findings with the roofing crew and address any issues immediately
- Provide guidance and corrective actions to ensure quality standards are met
Notify client that roofing work is substantially complete
Step 1: Verify Substantial Completion
- Confirm that all major aspects of the roofing work are complete
- Ensure that any remaining work does not impede the use or function of the roof
Step 2: Prepare Substantial Completion Notice
- Draft a substantial completion notice for the client, detailing completed work and any remaining minor tasks
- Include a list of completed phases and key milestones
Step 3: Schedule a Meeting with the Client
- Arrange a meeting with the client to present the substantial completion notice
- Confirm the meeting time and location with the client in advance
Step 4: Present Substantial Completion Notice
- Present the substantial completion notice to the client and review its contents
- Discuss any remaining minor tasks or outstanding items
Step 5: Obtain Client Acknowledgment
- Request the clients acknowledgment of substantial completion
- Obtain their signature on the substantial completion notice
Step 6: Address Client Questions or Concerns
- Allow the client to ask questions or express concerns about the completed work
- Provide clear responses and document any additional items raised
Step 7: Document Client Acknowledgment
- Record the clients acknowledgment in the project documentation
- File a copy of the signed substantial completion notice for records
Construction SOPs Your Employees Will Actually Use!
Subtrak’s game-changing SOP software helps contractors effortlessly document their processes and automatically delegate tasks to their entire project team, making sure everyone knows exactly what to do and when.
Schedule a demo today to see how Subtrak can save you time, money, and headaches!
Download Our Free eBook
Get Blueprint for Success, our free guide to scaling and systemizing your specialty trade construction business.