System-Specific Installation Workflows
Review cabinet/fixture layouts and joinery specs
Check receipt of all millwork components
Verify wall framing, layout, and floor flatness
Schedule post-finish carpentry dry-in
Use carpenters with brand-specific training
Assemble per cabinet layout and fastener plan
Use hardware, nails, biscuit joinery per spec
Pre-fit miters, transitions, hardware
Inspect each frame or millwork layer
Check hardware function, door swing
Realign trim, swap hinges
Snap final trim, built-ins
Schedule cabinetry finish check
Submit cabinetry hardware warranty
Give client cabinet/care paperwork