Review ceiling assembly diagrams and fastener spacing

Confirm boards, trims, fasteners delivered

Check ceiling framing, backing, temp, humidity

Plan install after ceiling/framing closed in

Assign crew experienced in specific board system

Hang, mud, finish per system details

Use screws, tape, and sanding per UL system

Dry-fit access panels, trim, reveals

Check coat smoothness, screw depth

None applicable

Patch seams, re-sand surfaces

Take before/after install photos

Schedule lid/ceiling final, if required

File board, joint brand warranty

Give board/finish guides if required