Final Inspection & Compliance Checklist for Electrical
The Final Inspection & Compliance Checklist workflow provides electrical contractors with a clear process for confirming compliance before closing projects. It includes reviewing installations, testing circuits, confirming code requirements, and documenting approvals from inspectors. Teams also resolve punch list items to ensure completion. By following this workflow, electricians reduce liability, protect against costly rework, and improve efficiency. Clients benefit from assurance that their systems are safe, compliant, and ready for use. The checklist also creates accountability for crews, ensuring nothing is overlooked. With this workflow in place, electrical contractors can protect profitability, strengthen professionalism, and close projects smoothly and reliably.
Confirm breaker count, load calc, and code
Walk panels, circuits, and fixtures
List outlet cover, panel, and wire issues
Route to electrician for outlet or panel fixes
Test circuits, panel cover, and breakers
File one-line, as-built, and AHJ docs
Verify GFCI, arc fault, and panel setup
Schedule final electrical walkthrough
Label panel, remove temp lighting, sweep
Explain circuit layout and final connections
Receive AHJ final or re-inspect notice
Correct GFCIs or wiring misses
File final electrical doc set
Notify GC/client of electrical sign-off
Store electrical inspection and logs
👈 Use this SOP template inside Subtrak
Edit with AI. Customize in seconds. Store and share all your SOPs and checklists in one place.