MEP Rough-In Readiness Checklist for Home Builder
This checklist ensures that all necessary preparations are completed before the mechanical, electrical, and plumbing (MEP) rough-in phase begins in custom home construction projects. It is crucial to verify that framing is complete, plans are coordinated, and all trades are aligned to prevent conflicts and delays. This checklist is designed for home builders specializing in custom homes with annual revenues between $5M and $50M, ensuring efficient and conflict-free rough-in work.
Verify framing completion
Step 1: Inspect structural framing
Walk through the site to inspect all structural framing elements, including walls, floors, and ceilings. Confirm that they are built according to the design plans and have passed any required inspections.
Step 2: Check for framing modifications
Review any changes or modifications to the framing that may affect MEP installations. Ensure that these changes are documented and approved by the project manager.
Coordinate with design plans
Step 1: Review architectural plans
Examine the architectural plans to understand the layout and design intent. Pay special attention to areas where MEP systems will be installed, such as kitchens, bathrooms, and utility rooms.
Step 2: Cross-check MEP plans
Compare the MEP plans with the architectural and structural plans. Look for potential conflicts, such as ductwork interfering with beams or plumbing lines crossing electrical conduits.
Step 3: Resolve discrepancies
Work with the design team to resolve any discrepancies between the plans. Ensure that all changes are documented and communicated to the relevant trades.
Verify trade scopes
Step 1: Review trade contracts
Examine the contracts and scope of work for each trade involved in the MEP rough-in. Ensure that each trade knows their specific responsibilities and deliverables.
Step 2: Conduct a pre-construction meeting
Organize a meeting with representatives from each trade to discuss their scopes and any potential overlaps. Encourage open communication to address any concerns.
Step 3: Document trade responsibilities
Create a document outlining the responsibilities of each trade. Distribute this document to all relevant parties to ensure everyone is on the same page.
Ensure layout clarity
Step 1: Mark MEP layout on site
Use chalk lines, spray paint, or other marking tools to outline the locations of MEP systems on the floors and walls. Ensure that these markings are clear and visible to all trades.
Step 2: Verify layout accuracy
Double-check the marked layout against the plans to ensure accuracy. Make any necessary adjustments to the markings to align with the design.
Step 3: Communicate layout to trades
Hold a site walk-through with representatives from each trade to review the layout markings. Ensure that everyone understands the layout and their respective installation areas.
Confirm site access
Step 1: Check site access points
Inspect the site to ensure that access points are clear and unobstructed. Confirm that there are no barriers preventing trades from reaching their work areas.
Step 2: Plan for material delivery
Coordinate with suppliers to schedule material deliveries at times that do not interfere with site access. Ensure that delivery vehicles have a clear path to the site.
Step 3: Communicate access plan
Share the access plan with all trades and suppliers. Ensure that everyone is aware of the designated access points and any restrictions that may be in place.
Verify material availability
Step 1: Inventory materials on site
Conduct an inventory of all materials required for the MEP rough-in. Check that all items are present and in good condition.
Step 2: Order missing materials
Identify any missing or damaged materials and place orders to replace them. Coordinate with suppliers to ensure timely delivery.
Step 3: Organize materials by trade
Arrange materials on site according to trade. Clearly label and store materials in designated areas to facilitate easy access for each trade.
Review inspection requirements
Step 1: Identify required inspections
Consult with the local building authority to determine the required inspections for each MEP system. Make a list of these inspections and their timing.
Step 2: Prepare for inspections
Ensure that all installations are completed and ready for inspection according to the schedule. Verify that all work meets the necessary standards and codes.
Step 3: Schedule inspections
Coordinate with the local building authority to schedule inspections. Ensure that all trades are aware of the inspection dates and are prepared to address any issues that may arise.
Plan MEP sequencing
Step 1: Determine installation order
Consult with the project manager and trade representatives to determine the optimal order for MEP installations. Consider factors such as space constraints and trade dependencies.
Step 2: Communicate sequencing plan
Share the sequencing plan with all trades. Ensure that everyone understands the order of operations and their respective roles in the process.
Step 3: Monitor sequencing progress
Regularly check the progress of MEP installations to ensure adherence to the sequencing plan. Address any deviations promptly to prevent conflicts and delays.
👈 Use this SOP template inside Subtrak
Edit with AI. Customize in seconds. Store and share all your SOPs and checklists in one place.