Standard Field Installation Procedures

Review riser diagram and fixture plan

Confirm rough piping and wall backing

Confirm pipe, fittings, and test gear onsite

Review hot work and fixture handling

Mark pipe runs and stub heights

Pipe and connect per fixture and slope reqs

Use spec pipe cement and hanger spacing

Use correct pipe straps and sealants

Check pipe pitch and alignment

Inspect joints, support, and tests

Repipe or reseal leaking fittings

Clean glue, tape, pipe scraps

Valve, pressure, and slope checks

Photograph rough and final piping