Hold Points, Inspections & In-Progress Approvals

Identify drain, water, and pressure tests

Insert drain, vent, and top-out review

Request plumbing inspector ahead of top-out

Clear access to plumbing and fixtures

Gather fixture specs and plumbing layout

Walk pipe runs and stub heights

Test water/air for leaks before inspection

Walk plumbing inspector through layout

Fix pipe slope or vent height

Obtain top-out or rough-in sign-off

Log plumbing sign-off and follow-ups

Send plumbing crew their punch list