In-Progress Quality Inspections for Plumbing
The In-Progress Quality Inspections workflow helps plumbing contractors monitor installations while work is underway. It includes checking pipe runs, fittings, fixture rough-ins, and pressure testing for compliance and quality before concealment. By using this process, plumbing companies reduce costly mistakes, protect profitability, and improve professionalism. Clients benefit from assurance that systems are properly installed and tested at each stage. Teams gain accountability with documented inspections and adjustments. With this workflow in place, plumbing contractors can strengthen credibility, improve efficiency, and deliver projects more reliably with fewer issues discovered at final inspection.
Identify pressure tests, fixture installs, venting
Set inspection post-rough-in and fixture set
Review plumbing risers, fitting, and vent specs
Observe trenching, pipe runs, and valve sets
Confirm slope, pitch, fitting types
Match slope and cleanout spacing to code
Photo incorrect slope or misfit connections
Flag incorrect fitting to plumbing sub
Direct plumber to reseat or realign fitting
Record replacement fittings or cleanouts
Enter issues in plumbing QC log
Notify plumbing lead with inspection note
Archive plumbing checklist and photos
👈 Use this SOP template inside Subtrak
Edit with AI. Customize in seconds. Store and share all your SOPs and checklists in one place.